Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Minutes of Community Calls"
m (→Agenda - 20-September-07) |
m (→Agenda - 20-September-07) |
||
Line 34: | Line 34: | ||
* Status of i6 Test Pass | * Status of i6 Test Pass | ||
− | * [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Cosmos&version=1.0&target_milestone=1.0i7&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= Review i7 enhancements] | + | * [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Cosmos&version=1.0&target_milestone=1.0i7&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= Review i7 enhancements] |
* Release Engineering Team Membership | * Release Engineering Team Membership | ||
* Reminder: Review [http://wiki.eclipse.org/COSMOS_dev_process COSMOS Development Process] - Walkthrough next week | * Reminder: Review [http://wiki.eclipse.org/COSMOS_dev_process COSMOS Development Process] - Walkthrough next week |
Revision as of 17:34, 19 September 2007
Contents
Community Meeting
Meeting Title: | Conference Call on COSMOS Community Meeting |
Link to information on Wiki: | COSMOS Main Page |
Date & Time: | Thursdays, at 1330 EST / 1:30pm EST |
Toll-free Dial-in number: | +1 (888) 241.8547 |
Primary International Dial-in: | +1.719.884.0812 |
T/L Dial-in: | +650.3324 |
Passcode: | 999451# |
Contact
Email [Toni Drapkin] Phone +1 (919) 254.5224
Agenda - 20-September-07
- Status of i6 Test Pass
- Review i7 enhancements
- Release Engineering Team Membership
- Reminder: Review COSMOS Development Process - Walkthrough next week
Reference:
Actions from 9/6 Meeting:
- Post a link to the draft development process on the dev mailing list - Tania
- Close on outstanding IPZilla items by end of i7 - Sheldon, Mark, David
- Create IPZilla entry for CMDBf WSDLs - Mark
Actions from 8/30 Meeting:
- Work with Toni to find out the nomination requirements to begin working on the package for CA committers - Tania
Actions from 8/23 Meeting:
- Open bugzilla entries for creating separate component builds, merging the Test Pass Reports tab with the Development tab on the Downloads page, and making builds available through Eclipse - Balan
Actions from 8/16 Meeting:
- Create a plan to educate Data Collection committers on the test process for the Data Collection component. This should be covered in an upcoming Data Collection meeting - Don
Actions from 8/2 Meeting:
- Balan will post move review package to devlist
Outstanding Actions from 4/19 Meeting:
- During next architecture call we need to determine which platforms should be covered in iteration testing - Mark (Update: Will cover in 5/30 architecture call)