Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Management Enablement"

(Added this week's minutes as a link)
(Agenda (6/24/08))
Line 35: Line 35:
 
== Agenda (6/24/08) ==
 
== Agenda (6/24/08) ==
  
# i11 status updates
+
# i12 status
#* i12 plan
+
#* http://wiki.eclipse.org/Category:COSMOS_candidate
#** http://wiki.eclipse.org/COSMOS/COSMOS_iteration_i12_plan
+
#* SDD deliverables
#** i12 to close first week of August
+
#* P2 follow-up (Jason)
#** SDD candidate driver not containable - what will be delivered?
+
#* Tooling update (Eric/Chris/Josh/Robert)
#** CMDBf toolkit enhancements
+
 
# Follow-up on action items
 
# Follow-up on action items
#* Jason to commit SAS zip extractor code, Mark to change packages to align with COSMOS requirements.
+
#* Need to refactor zip extractor package name (Jason/Mark)
#** Changes have been made, ready to commit
+
#* Reuse of p2 in COSMOS SDD
#* Continue work on SDD for COSMOS
+
#** Dependent on DOJO situation (DOJO currently referenced in the draft SDD) - update ME team on DOJO situation
+
#* Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
+
#** Done for phase 1 - now alignment with P2
+
#* Eric to enter any additional Tooling ERs for i12?
+
  
 
Time permitting … alignment/integration topics
 
Time permitting … alignment/integration topics

Revision as of 10:23, 8 July 2008

COSMOS Main Page


Management Enablement

Meeting Title: COSMOS Management Enablement Weekly Meeting
Link to information on Wiki:
Date & Time: Tuesday at 11:00 EDT / 11:00am EDT
Toll-free Dial-in number: 1-877-641-0660
Primary International Dial-in: + 1-919-531-0660 (Requires International prefix first)
Passcode: 107017

Contact

Email [Jason Losh]


Working Design Documents

Headline text

Agenda (6/24/08)

  1. i12 status
  2. Follow-up on action items
    • Need to refactor zip extractor package name (Jason/Mark)
    • Reuse of p2 in COSMOS SDD

Time permitting … alignment/integration topics

  1. P2/SDD runtime alignment
  2. SML/CML/SDD/OVF alignment
    • Ongoing
  3. CMDBf integration
    • Ongoing

Agenda (6/10/08)

  1. i11 status updates
  2. Follow-up on action items
    • Jason to commit SAS zip extractor code, Mark to change packages to align with COSMOS requirements.
      • Update from Jason: to be done this week
    • Continue work on SDD for COSMOS.
      • Update from Jason: Picking this back up this week
    • Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
      • Update from Jason: In progress. Jeff has done a nice job updating the design document.
    • Eric to enter any additional Tooling ERs for i11.
    • Charlie to set up another meeting with P2 Equinox team.
      • I believe Charlies is out today (6/10)
    • SDD User Guide?
      • Update from Jason: SDD user guide should be removed. We have nothing substantive to document yet. We/I need to write the COSMOS installation guide for the current install process, however.
    • Discuss Runtime design documentation.
  3. Runtime architecture discussion based on Julia's feedback

Time permitting … alignment/integration topics

  1. P2/SDD runtime alignment
    • Charlie to provide an update on scheduling a meeting to discuss P2/SDD again
  2. SML/CML/SDD/OVF alignment
    • Pending discussion between Mark W. and Jason. No update yet.
  3. CMDBf integration
    • Tee this as a future discussion item as well. May not be covered in this call.

Minutes of prior meetings

Back to the top