Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Management Enablement"

(Agenda (10/07/08))
Line 40: Line 40:
 
== Agenda (10/07/08) ==
 
== Agenda (10/07/08) ==
  
Discuss defects for COSMOS 1.0 inclusion:
+
From Eric - Discuss defects for COSMOS 1.0 inclusion:
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249652 249652] - SPI outputs incorrect date format for lastModified attribute
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249652 249652] - SPI outputs incorrect date format for lastModified attribute
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249655 249655] - SPI: descriptorID getter/setter should return/take a byte[] instead of String
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249655 249655] - SPI: descriptorID getter/setter should return/take a byte[] instead of String
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249349 249349] - SDD Validator JUnits use incorrect Schematron location
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249349 249349] - SDD Validator JUnits use incorrect Schematron location
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249714 249714] - SPI: createAdditionalContent() creates element with incorrect attribute name
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249714 249714] - SPI: createAdditionalContent() creates element with incorrect attribute name
 +
* Schema checkin status
 +
* TPTP test checkin status
 +
* [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&product=Cosmos&target_milestone=---&target_milestone=1.0i1&target_milestone=1.0i2&target_milestone=1.0i3&target_milestone=1.0i4&target_milestone=1.0i5&target_milestone=1.0i6&target_milestone=1.0i7&target_milestone=1.0i8&target_milestone=1.0i9&target_milestone=i10&target_milestone=i11&target_milestone=1.0i12&target_milestone=1.0i13&target_milestone=1.0i14&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Importance&field0-0-0=noop&type0-0-0=noop&value0-0-0= Bugzilla cleanup.]
 +
* Documentation updates for SDD tooling
 +
* SDD tooling build updates
 +
*# Saurahb reported a problem building SPI, Validator, and Change Analyzer -- have these been resolved?
 +
* JAXB implementation for Change Analyzer - requires IPzilla approval from Eclipse Legal OR COSMOS 1.1/2.0 to require JRE/JDK 1.6
 +
* Change resolver status update
  
 
== Agenda (9/30/08) ==
 
== Agenda (9/30/08) ==

Revision as of 13:27, 6 October 2008

COSMOS Main Page


Management Enablement

Meeting Title: COSMOS Management Enablement Weekly Meeting
Link to information on Wiki:
Date & Time: Tuesday at 11:00 EDT / 11:00am EDT
Toll-free Dial-in number: 1-888-682-4285
Primary International Dial-in: + 1-973-368-0695 (Requires International prefix first)
SAS Employees: x40000
Conference Code: 3358100246

Contact

Email [Jason Losh]


Working Design Documents

Misc Documents

Agenda (10/07/08)

From Eric - Discuss defects for COSMOS 1.0 inclusion:

  • 249652 - SPI outputs incorrect date format for lastModified attribute
  • 249655 - SPI: descriptorID getter/setter should return/take a byte[] instead of String
  • 249349 - SDD Validator JUnits use incorrect Schematron location
  • 249714 - SPI: createAdditionalContent() creates element with incorrect attribute name
  • Schema checkin status
  • TPTP test checkin status
  • Bugzilla cleanup.
  • Documentation updates for SDD tooling
  • SDD tooling build updates
    1. Saurahb reported a problem building SPI, Validator, and Change Analyzer -- have these been resolved?
  • JAXB implementation for Change Analyzer - requires IPzilla approval from Eclipse Legal OR COSMOS 1.1/2.0 to require JRE/JDK 1.6
  • Change resolver status update

Agenda (9/30/08)

  1. Administrative
  2. Countdown to COSMOS 1.0
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • BTG/rules status (Josh/Robert)
    • Change analyzer update (Merri/Mark/Brad/Jeff)
  4. Runtime update (Jeff/Jason)
    • Change resolver progress (Jeff)

Agenda (9/16/08)

  1. Administrative
    • Welcome Lazar (SAP) to the team
  2. i13 testing status
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • ERs identified for i14
    • BTG/rules status (Josh/Robert)
    • Change analyzer update (Merri/Mark/Brad/Jeff)
  4. Runtime update (Jeff/Jason)
    • Change resolver design (Jeff)
  5. SML discussion

Agenda (9/9/08)

  1. Administrative
    • Welcome Lazar (SAP) to the team
    • Update on SAS participation
  2. i13 testing status
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • Scoping for i14
    • BTG status (Josh/Robert)
      • TPTP tests
    • Change analyzer update (Merri)
  4. Runtime update (Jeff)
    • Change resolver design




Minutes of prior meetings

Back to the top