Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Architecture Meetings"

('' Agenda for Feb 13, 2008 '')
Line 10: Line 10:
 
|-
 
|-
 
| Date & Time:  
 
| Date & Time:  
| Febuary 6, 2008 at [http://www.timeanddate.com/worldclock/fixedtime.html?month=02&day=06&year=2008&hour=10&min=00&sec=0&p1=179 10:00AM EST]
+
| Febuary 13, 2008 at [http://www.timeanddate.com/worldclock/fixedtime.html?month=02&day=06&year=2008&hour=10&min=00&sec=0&p1=179 10:00AM EST]
 
|-
 
|-
 
| Tie line:   
 
| Tie line:   
Line 30: Line 30:
 
=== '''Agenda''' ===
 
=== '''Agenda''' ===
 
* i9 integration build: status report on our first targeted build (10 min)
 
* i9 integration build: status report on our first targeted build (10 min)
* QA Discussion carry over from Monday's summit [http://wiki.eclipse.org/COSMOS_QA_Criteria COSMOS_QA_Criteria ](50 min)
 
* CMDBf Registration APIs
 
** http://wiki.eclipse.org/COSMOS_Design_214672
 
** http://wiki.eclipse.org/Talk:COSMOS_Design_214672
 
* Should we use command line or web UI to manage COSMOS components?  (e.g. register broker with management domain, etc.)
 
** Is the command line client a temporary solution? 
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=215502 Bug 215502]
 
* Target environment for data managers in the demo: 
 
** Should we package all 4 data managers for Tomcat in the demo for i9?
 
** We need to put together a deployment and dependency diagrams for i9
 
* Eclipse version: 3.3.x vs. 3.4
 
** Eclipse 3.4 and the Ganymede simultaineous release will release in June.
 
** Web development for data visualization and data managers require WTP 3.0, which runs with eclipse 3.4.
 
** The build is currently using eclipse 3.3. 
 
** Need to decide if we want to change development and build environment to eclipse 3.4.
 
* Documentation plan [http://wiki.eclipse.org/COSMOS_Manual_Guide Proposed Table of Contents] - moved this topic to 2/7 Community Call
 
 
=== House Keeping ===
 
* TBD
 
 
=== '' Agenda for Feb 13, 2008 '' ===
 
* Review build wish list at http://wiki.eclipse.org/COSMOS_RE_AND_BUILD_WISH_LIST
 
 
* i9 iteration close items - Jimmy Mohsin
 
* i9 iteration close items - Jimmy Mohsin
 +
* Review build wish list at http://wiki.eclipse.org/COSMOS_RE_AND_BUILD_WISH_LIST
 
** Expected completion date for http://wiki.eclipse.org/COSMOS_i9_e2e_testing
 
** Expected completion date for http://wiki.eclipse.org/COSMOS_i9_e2e_testing
 
** How will QA check in test results into CVS, given that there are no committers on the QA team?
 
** How will QA check in test results into CVS, given that there are no committers on the QA team?
Line 60: Line 39:
 
** Analyze the flow of a typical query and determine what security artifacts are contained in the payload
 
** Analyze the flow of a typical query and determine what security artifacts are contained in the payload
 
** Analyze the flow of a non-query "management-style" (e.g. shot down the broker) requests, assuming we even support these, and determine what security artifacts are contained in the payload
 
** Analyze the flow of a non-query "management-style" (e.g. shot down the broker) requests, assuming we even support these, and determine what security artifacts are contained in the payload
 +
 +
=== House Keeping ===
 +
* TBD
 +
 +
=== '' Agenda for Feb 20, 2008 '' ===
  
 
=== ''Agenda for Future Meetings'' ===
 
=== ''Agenda for Future Meetings'' ===

Revision as of 09:17, 13 February 2008

Back to COSMOS Home

Meeting Information

Meeting Title: Conference Call on Overall COSMOS Architecture
Link to information on Wiki: Architecture and design documents
Date & Time: Febuary 13, 2008 at 10:00AM EST
Tie line: 8-421-0033
Toll-free Dial-in number: +1 (877) 421 0033
Primary International Dial-in: TBD
Passcode: COSMOS (267667)#



Agenda

  • i9 integration build: status report on our first targeted build (10 min)
  • i9 iteration close items - Jimmy Mohsin
  • Review build wish list at http://wiki.eclipse.org/COSMOS_RE_AND_BUILD_WISH_LIST
    • Expected completion date for http://wiki.eclipse.org/COSMOS_i9_e2e_testing
    • How will QA check in test results into CVS, given that there are no committers on the QA team?
    • Lifecycle for i9 ER's post "FIXED" status, i.e. post Feb 22
  • Review "Scoping of the COSMOS Security Infrastructure" http://wiki.eclipse.org/COSMOS_Design_209337 and determine if any i9 ERs are needed as a consequence - Jimmy Mohsin (time permitting)
    • Review the updated use cases
    • Analyze the flow of a typical query and determine what security artifacts are contained in the payload
    • Analyze the flow of a non-query "management-style" (e.g. shot down the broker) requests, assuming we even support these, and determine what security artifacts are contained in the payload

House Keeping

  • TBD

Agenda for Feb 20, 2008

Agenda for Future Meetings

  • How do we support OSGi? (Maybe in march summit)

Minutes from past meetings

Cosmos Architecture Meeting 06-Feb-08

Cosmos Architecture Meeting 30-Jan-08

Cosmos Architecture Meeting 23-Jan-08

Cosmos Architecture Meeting 16-Jan-08

Cosmos Architecture Meeting 09-Jan-08

Cosmos Architecture Meeting 02-Jan-08




Cosmos Archived Architecture Meeting Minutes

Back to the top