Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
VIATRA/DeveloperMeetingMinutes/Meeting20170504
< VIATRA | DeveloperMeetingMinutes
Revision as of 09:35, 16 May 2017 by Zoltan.ujhelyi.incquerylabs.com (Talk | contribs) (Created page with "== Topics == * {{VIATRA-Status}} * TODOs from last week ** Gaben: Dangling edge: merge tests and provide documentation ** Zoli: Evaluate Guava usage in generated code ** Gaben...")
Topics
- Current status: Bugzilla Gerrit AERI
- TODOs from last week
- Gaben: Dangling edge: merge tests and provide documentation
- Zoli: Evaluate Guava usage in generated code
- Gaben: Enum constraints in dynamic mode
- Abel and Zoltan: go through issues for 1.6
- 1.6 progress
- Feature freeze: 17th May, Wednesday
- DRed status
Minutes
- Gaben: testing framework API is not straightforward when using both scope and snapshot
- Enum constraints in dynamic mode: Gaben started working on this
- 1.6 feature freeze on May 17th
- Issues for 1.6: we went through them, postponed to 1.7 where necessary
- DRed status: Gerrit changes updated by Tamas, Gaben will have a look
- Changes default behavior, must be extensively tested (performance wise)
- Strategy: if code review & basic functional testing passes, merge before the feature freeze & test afterwards (roll back before release if necessary)
- Coverage measurement in testing framework
- Gerrit changes under review, final stages
- Guava usage
- Zoltan will work on this
- First experiment: add uses constraints accordingly
- The final dependency range for Guava will be decided based on these results
- Papyrus will be a good candidate for testing, as it uses Guava 21 internally