Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
PTP/meetings/July 2014
July 2014 Meeting
Date: July 8, 2014 Time: 1:00 PM EDT
Call in information:
Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402
Agenda
- Overall project, releases, etc.
- Last release was Luna-based PTP 8.0.0 with Eclipse Luna simultaneous release on June 25
- Next release 8.0.1 - later this week? Prior to XSEDE14 tutorial next Monday
- We already have several bugs to go into it.
- Outstanding bugs for Luna
- Git branches - which build is where?
- master
- ptp_8_0
- other?
- Summary from last month: continue to have bug-fix branch ptp_8_0 for bug fixes, and merge into master. At SR time, use master branch for the SR. if there are new API or new feature, put into master and we will determine then if we need minor or major release or point release and determine the version. e.g. 8.1 vs 8.0.1
- How to put ptp_8_0 bug fix commits into master - Merge? Cherry Pick? (Per ptp-dev discussion)
- Future releases: point release at SR milestones like CDT project does?
- E.g. PTP 8.1 at Luna SR1, 8.2 at SR2, etc. This allows us to add new features more than once a year.
- We talked about this last month but was there any resolution? "Wait and see if we have new features" ?
- Downloads (see bottom of page): Parallel Package: over 164K?? for Kepler-SR2 Parallel package - Luna 18,103 as of July 7 - INTERESTING STATS:
- Highest ever single release: Juno SR1 February 2013 -- 290,533
- Indigo SR2 final -- June 2012 -- 64,860
- Juno SR2 final -- June 2013-- 128,853
- Kepler SR2 final -- June 2014 --191,893
- Follow-up on last month etc.
- Hackathon - at LSU / Baton Rouge (Steve Brandt, Host) - Aug 12-14 (12-13? 13-14?)
- https://wiki.eclipse.org/PTP/workshops/PTP_Workshop_2014
- Invite Eclipse Science Working group ? https://wiki.eclipse.org/Science_IWG
- travel assistance: who to contact first? Steve or Jay?
- We should nominate bugs to be worked on during the hackathon prior to the meeting - could vote in Bugzilla
- Hackathon - at LSU / Baton Rouge (Steve Brandt, Host) - Aug 12-14 (12-13? 13-14?)
- PTP User meeting next meeting - Wed July 23 - introduce Luna features?
- Luna new features including new GUI terminal (Steve B can demo) - need other volunteers
- Status Reports
- ?
- Future planning for 2014 possible PTP tutorials/outreach?
- XSEDE - Monday July 14, 2014, Atlanta - Conference is July 13-18, 2014 in Atlanta https://www.xsede.org/web/conference/xsede14
- BOF is Tuesday morning early
- SC14 - Nov 16-21 2014, tutorial was not accepted
- SC14 BOF has been submitted
- XSEDE - Monday July 14, 2014, Atlanta - Conference is July 13-18, 2014 in Atlanta https://www.xsede.org/web/conference/xsede14
- Any TM topics?
- Next Meeting August 12
Attendees
Greg, Beth, Wyatt, Jeff, John, Jay A, Chris N, Hari, Steve
Minutes
- Can we get an allocation for trestles userids for prep for XSEDE14 tutorial? Jay will get for Greg
- Kepler development ceased? Focus on Luna now.
- Git branches - which build is where?
- master - will be 8.1 or 9.0
- ptp_8_0 - bug fixes - then merge with master branch
- Next sim release is Mars
- 8.0.1 release end of this week - would be available for XSEDE tutorial on Monday
- debugger fix for OpenMPI 1.8 - is in 8.0.1 build. Beth will respond to poster for him to test.
- Greg also needs to check it works for older OpenMPI's - esp e.g. on trestles.
- 437560, 439084: bug: pick current path and type subdir when it returns. Use this for tutorial slides.
- Wyatt: will try modules on trestles
- Where are builds?
- master - openmpi fix is in there
- ptp_8_0 - not a separate
- Greg needs to shift release to 8.0, nightly still will be maintenance will be ptp 7.0=kepler - will try to do that today (and Beth will test links)
- point release e.g. 8.1 would require a release review, set deadline for API changes, etc - prior to SR release.
- Downloads: Beth will total R+SR1+SR2
- Hackathon: advertize at XSEDE tutorial & BOF. https://wiki.eclipse.org/PTP/workshops/PTP_Workshop_2014
- Aug 12-13 in Baton Rouge - contact Steve first re: travel support
- Greg invited Eclipse Science working group
- Lodging: Staybridge Suites (not Comfort) or Lod Cook
- Status reports
- Wyatt has been doing some perf visualization via a javaFX bridge? Perhaps can reference into lightweight support that can be integrated with Eclipse/PTP
- Greg: working on some remote stuff
- John E: talked about replacing test suite plug-in? Different package - get rid of old one, use new one (diff. name) sync core tests ?
- Next meeting would be during Hackathon - August 12 - plan to call in via a speakerphone while we're there.
- Hackathon attendees tentatively include: John, Jeff, Beth, Greg, Wyatt, Chris N maybe, Dave W, Jay
Parallel Package Downloads
Download numbers, by month, of 'Eclipse for Parallel Application Developers' available on http://eclipse.org/downloads. Each release (e.g. R,SR1,SR2) the counts are set to 0 and restarted.
Release | Month | Downloads | Total Downloads |
---|---|---|---|
Indigo SR1 | thru Feb 2012 | 40,298 | |
Indigo SR2 | thru June 2012 | 64,860 | |
Juno | (4 days!) June 2012 | 902 | 902 |
Juno | July 2012 | 8169 | 9071 |
Juno | August 2012 | 19,112 | 28,009 |
Juno | September 2012 | 47,648 | 76,457 |
Juno SR1 | September 2012 | 5346 | 5346 |
Juno SR1 | October 2012 | 65,353 | 70,699 |
Juno SR1 | November 2012 | 58,796 | 129,495 |
Juno SR1 | December 2012 | 57,811 | 187,306 |
Juno SR1 | January 2013 | 63,350 | 250,656 |
Juno SR1 | February 2013 | 39,877 | 290,533 |
Juno SR2 | March 2013 | 41,367 | 41,367 |
Juno SR2 | April 2013 | 36,372 | 77,739 |
Juno SR2 | May 2013 | 28,575 | 106,316 |
Juno SR2 | June 2013 | 22,521 | 128,853 |
Kepler R | (5 days) June 2013 | 4003 | 4003 |
Kepler R | July 2013 | 26,070 | 30,073 |
Kepler R | August 2013 | 26,732 | 56,805 |
Kepler R | September 2013 | 28,751 | 85,556 |
Kepler SR1 | (4 days) Sept 2013 | 4670 | 4670 |
Kepler SR1 | October 2013 | 40,440 | 45,110 |
Kepler SR1 | November 2013 | 48,723 | 93,833 |
Kepler SR1 | December 2013 | 39,648 | 133,481 |
Kepler SR1 | January 2014 | 36,085 | 169,566 |
Kepler SR1 | February 2014 | 39,193 | 208,759 |
Kepler SR2 | February 2014 | 1189 | 1189 |
Kepler SR2 | March 2014 | 57,038 | 58,227 |
Kepler SR2 | April 2014 | 52,080 | 110,307 |
Kepler SR2 | May 2014 | 41,033 | 151,340 |
Kepler SR2 | June 2014 | 40,553 | 191,893 |
Luna R | (6 days) June 2014 | 7554 | 7554 |
Luna R | July* 2014 | 20,206 |
July* downloads as of July 8