Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Swordfish Documentation: Sprint Plan"

(Swordfish Sprints for Galileo)
Line 4: Line 4:
  
 
[[Image:Swordfish_Galileo_SprintPlan.png | Swordfish Sprint Schedule]]
 
[[Image:Swordfish_Galileo_SprintPlan.png | Swordfish Sprint Schedule]]
 +
 +
Update 27.03.2009: Merged sprints 4 and 5:
 +
* Fr. 03.04: Sprint 3 Demo, Retrospective + Feature Estimates
 +
* Mo. 06.04: Sprint 4 Planung
 +
* Tue. 07.04 until incl. Mi. 29.04:  Sprint 4 development
 +
* Mo. 20.04:  Checkpoint: All mandatory M7 requirements fulfilled?
 +
* Thu. 30.04: Sprint 4 Demo
  
  

Revision as of 10:23, 29 March 2009

{{#eclipseproject:rt.swordfish}}

Swordfish Sprints for Galileo

Swordfish Sprint Schedule

Update 27.03.2009: Merged sprints 4 and 5:

  • Fr. 03.04: Sprint 3 Demo, Retrospective + Feature Estimates
  • Mo. 06.04: Sprint 4 Planung
  • Tue. 07.04 until incl. Mi. 29.04: Sprint 4 development
  • Mo. 20.04: Checkpoint: All mandatory M7 requirements fulfilled?
  • Thu. 30.04: Sprint 4 Demo


Swordfish is developed using the scrum method. For the Galileo release the following sprints have been scheduled in synchronization with the Galileo Milestones for the Swordfish project. The Features and Tasks for Each sprint can be accessed through the links below:

sprint1: 09.02.2009 – 05.03.2009

sprint2: 06.03.2009 – 18.03.2009 (M6)

sprint3: 19.03.2009 – 02.04.2009

sprint4: 03.04.2009 – 16.04.2009

sprint5: 17.04.2009 – 06.05.2009 (M7)

sprint6: 07.05.2009 – 20.05.2009 (RC1)

Release: 21.05.2009 – 17.06.2009 (Endgame)




Swordfish Wiki Home

Back to the top