Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "EDT:0.7.0 Planning"
Line 12: | Line 12: | ||
**[[EDT:0.7.0 Planning:Iteration 12]] (8/8-8/19) | **[[EDT:0.7.0 Planning:Iteration 12]] (8/8-8/19) | ||
**[[EDT:0.7.0 Planning:Iteration 13]] (8/22-9/2) | **[[EDT:0.7.0 Planning:Iteration 13]] (8/22-9/2) | ||
− | **[[EDT:0.7.0 Planning:Iteration 14]] (9/5-9/16) | + | **[[EDT:0.7.0 Planning:Iteration 14]] (9/5-9/16) |
− | * | + | **[[EDT:0.7.0 Planning:Iteration 15]] (9/19-9/30) |
− | *0.7.0 Availability | + | *SVT |
+ | *Release Candidate 1 TBD | ||
+ | *0.7.0 Availability TBD | ||
Revision as of 15:10, 15 September 2011
- Milestone 1 (5/27/2011)
- EDT:0.7.0 Planning:Iteration 4 (4/4-4/15)
- EDT:0.7.0 Planning:Iteration 5 (4/18-4/29)
- EDT:0.7.0 Planning:Iteration 6 (5/2-5/13)
- EDT:0.7.0 Planning:Iteration 7 (5/16-5/27)
- Milestone 2 (8/5/2011)
- EDT:0.7.0 Planning:Iteration 8 (5/31-6/17)
- EDT:0.7.0 Planning:Iteration 9 (6/20-7/8)
- EDT:0.7.0 Planning:Iteration 10 (7/11-7/22)
- EDT:0.7.0 Planning:Iteration 11 (7/25-8/5)
- Milestone 3 (9/16/2011)
- EDT:0.7.0 Planning:Iteration 12 (8/8-8/19)
- EDT:0.7.0 Planning:Iteration 13 (8/22-9/2)
- EDT:0.7.0 Planning:Iteration 14 (9/5-9/16)
- EDT:0.7.0 Planning:Iteration 15 (9/19-9/30)
- SVT
- Release Candidate 1 TBD
- 0.7.0 Availability TBD
Planning Spreadsheet
Media:EDT_070_Planning_I-12_Aug-10.zip This zip file contains an Excel spreadsheet used for planning the release content. (The wiki doesn't allow us to attach .xls files.) Before editing the spreadsheet, "lock" it by putting your name next to the link. Remove your name after you update the spreadsheet.