Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Management Enablement"

(Management Enablement)
Line 25: Line 25:
  
 
== Contact ==
 
== Contact ==
* Jason Losh
+
Email [[mailto:Jason.Losh@sas.com|'''Jason Losh''']]
 +
Phone
  
 
== Working Design Documents ==
 
== Working Design Documents ==
 
[[COSMOS_Design_198553|198553: Provide an implementatin of WS Resource Catalog]]
 
[[COSMOS_Design_198553|198553: Provide an implementatin of WS Resource Catalog]]
 
[https://bugs.eclipse.org/bugs/show_bug.cgi?id=198553 198553]
 
[https://bugs.eclipse.org/bugs/show_bug.cgi?id=198553 198553]
 +
 +
 +
== Work Items ==
 +
* [[COSMOS_SDD_Runtime_Architecture]]
 +
 +
 +
== Agenda ==
 +
# i11 work items for SDD
 +
#* http://wiki.eclipse.org/COSMOS/COSMOS_iteration_i11_plan
 +
#* SDD bug list https://bugs.eclipse.org/bugs/buglist.cgi?query_format=specific&order=relevance+desc&bug_status=__open__&product=Cosmos&content=SDD
 +
# Update from Eric/Yan/Chris/Josh/Robert on tools work
 +
# Status of zip extractor contribution
 +
# Status of tool code contribution
 +
# Status of change analyzer code contribution
 +
# Runtime design discussion
 +
# Follow-up on action items
 +
#* Charlie/Chris/Eric, commit code when legal issues are worked out with Eclipse.
 +
#* Jason to commit SAS SDD Tooling code simultaneous with IBM SDD Tooling.
 +
#* Jason to commit SAS zip extractor code.
 +
#* Mark W to contact Eclipse about adding SDD Tooling code (since contributions are over 200 lines of code) and about in place replacement of Tuscany.
 +
#* Jason to start moving use cases and "details" into COSMOS Use Cases and begin entering i11 enhancement requests.
 +
#* Continue work on SDD for COSMOS.
 +
#* Josh to determine the exact number of lines that SAS has for BTG code since it is close to 250.
 +
#* Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
 +
#* Charlie to get VP approval for Use Cases and put them on a wiki. Update: use case doc placed on Use Case wiki page: [http://wiki.eclipse.org/COSMOS_Use_Cases#SDD_Deployment]
 +
#* Schedule meetings to discuss Runtime design document that is being worked on and circulated.
 +
 +
== Minutes of prior meetings ==
 +
* [[COSMOS_SDD_Minutes_08MAY08|May 8, 2008]]
 +
* [[COSMOS_SDD_Minutes_01MAY08|May 1, 2008]]
 +
* [[COSMOS_SDD_Minutes_24APR08|April 24, 2008]]
 +
* [[COSMOS_SDD_Minutes_15APR08|April 15, 2008]]
 +
* [[COSMOS_SDD_Minutes_08APR08|April 8, 2008]]
 +
* [[COSMOS_Install_Requirements|April 4, 2008 COSMOS installer requirements meeting]]
 +
* [[COSMOS_SDD_Minutes_01APR08|April 1, 2008]]
 +
* [[COSMOS_SDD_Minutes_25MAR08|March 25, 2008]]
 +
* [[COSMOS_SDD_Minutes_18MAR08_11AM|March 18, 2008 COSMOS installer follow-up meeting]]
 +
* [[COSMOS_SDD_Minutes_18MAR08|March 18, 2008]]
 +
* [[COSMOS_SDD_Minutes_11MAR08|March 11, 2008]]
 +
* [[COSMOS_SDD_Minutes_04MAR08|March 4, 2008]]
 +
* [[COSMOS_SDD_Minutes_26FEB08|February 26, 2008]]
 +
* [[COSMOS_SDD_Minutes_19FEB08|February 19, 2008]]
 +
* [[COSMOS_SDD_Minutes_12FEB08|February 12, 2008]]
 +
* [[COSMOS_SDD_Minutes_05FEB08|February 5, 2008]]
 +
* [[COSMOS_SDD_Minutes_29JAN08|January 29, 2008]]
 +
* [[COSMOS_SDD_Minutes_22JAN08|January 22, 2008]]
 +
* [[COSMOS_SDD_Minutes_15JAN08|January 15, 2008]]
 +
* [[COSMOS_SDD_Minutes_14JAN08|January 14, 2008]]
 +
* [[COSMOS_SDD_Minutes_08JAN08|January 8, 2008]]

Revision as of 10:02, 21 May 2008

COSMOS Main Page


Management Enablement

Meeting Title: COSMOS Management Enablement Weekly Meeting
Link to information on Wiki:
Date & Time: Tuesday at 4:00 EDT / 4:00pm EDT
Toll-free Dial-in number: 1-877-641-0660
Primary International Dial-in: + 1-919-531-0660 (Requires International prefix first)
Passcode: 107017

Contact

Email [Jason Losh] Phone

Working Design Documents

198553: Provide an implementatin of WS Resource Catalog 198553


Work Items


Agenda

  1. i11 work items for SDD
  2. Update from Eric/Yan/Chris/Josh/Robert on tools work
  3. Status of zip extractor contribution
  4. Status of tool code contribution
  5. Status of change analyzer code contribution
  6. Runtime design discussion
  7. Follow-up on action items
    • Charlie/Chris/Eric, commit code when legal issues are worked out with Eclipse.
    • Jason to commit SAS SDD Tooling code simultaneous with IBM SDD Tooling.
    • Jason to commit SAS zip extractor code.
    • Mark W to contact Eclipse about adding SDD Tooling code (since contributions are over 200 lines of code) and about in place replacement of Tuscany.
    • Jason to start moving use cases and "details" into COSMOS Use Cases and begin entering i11 enhancement requests.
    • Continue work on SDD for COSMOS.
    • Josh to determine the exact number of lines that SAS has for BTG code since it is close to 250.
    • Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
    • Charlie to get VP approval for Use Cases and put them on a wiki. Update: use case doc placed on Use Case wiki page: [1]
    • Schedule meetings to discuss Runtime design document that is being worked on and circulated.

Minutes of prior meetings

Back to the top