Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TPTP Jan 07 face to face"

m
Line 15: Line 15:
 
**4.3.1
 
**4.3.1
 
     *
 
     *
 
 
*'''any role changes'''
 
*'''any role changes'''
 
 
     *
 
     *
 
 
*'''any project structure changes'''
 
*'''any project structure changes'''
 
 
     *
 
     *
 
 
*'''2006 in reflection'''
 
*'''2006 in reflection'''
 
 
     *
 
     *
 
 
*'''review each of the project feed backs on what can be done better and what was great'''
 
*'''review each of the project feed backs on what can be done better and what was great'''
 
     *
 
     *
Line 33: Line 26:
  
 
*'''2007 1H resource planning'''
 
*'''2007 1H resource planning'''
 
 
     *
 
     *
 
 
*'''assess contribution levels and determine what is supportable. Perhaps new approaches are needed'''
 
*'''assess contribution levels and determine what is supportable. Perhaps new approaches are needed'''
 
     *
 
     *
 
 
*'''assess future maintenance streams'''
 
*'''assess future maintenance streams'''
 
 
     *
 
     *
 
 
*'''4.4 enhancement status'''
 
*'''4.4 enhancement status'''
 
** Stage 1
 
** Stage 1
Line 48: Line 36:
 
** Stage 2
 
** Stage 2
 
     *
 
     *
 
 
*'''close on 4.4 plan'''
 
*'''close on 4.4 plan'''
 
     *
 
     *

Revision as of 09:02, 9 January 2007

When a call in is active the number will be

Conference ID: 6044164

Dial in Local number: 416-343-2622

Toll-free Dial-in number: 1 866-516-6489

Agenda topics Jan 9/10/11 2007

  • Deal with current issues
    • 4.4 aka Europa M4 build
   *
    • 4.2.2
   *
    • 4.3.1
   *
  • any role changes
   *
  • any project structure changes
   *
  • 2006 in reflection
   *
  • review each of the project feed backs on what can be done better and what was great
   *
   * propose use of TPTP wiki for discussion and minutes but not as a substitute for other controled forums. 
  • 2007 1H resource planning
   *
  • assess contribution levels and determine what is supportable. Perhaps new approaches are needed
   *
  • assess future maintenance streams
   *
  • 4.4 enhancement status
    • Stage 1
   *
    • Stage 2
   *
  • close on 4.4 plan
   *

Back to the top