Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "TPTP Jan 07 face to face"
m |
|||
Line 15: | Line 15: | ||
**4.3.1 | **4.3.1 | ||
* | * | ||
− | |||
*'''any role changes''' | *'''any role changes''' | ||
− | |||
* | * | ||
− | |||
*'''any project structure changes''' | *'''any project structure changes''' | ||
− | |||
* | * | ||
− | |||
*'''2006 in reflection''' | *'''2006 in reflection''' | ||
− | |||
* | * | ||
− | |||
*'''review each of the project feed backs on what can be done better and what was great''' | *'''review each of the project feed backs on what can be done better and what was great''' | ||
* | * | ||
Line 33: | Line 26: | ||
*'''2007 1H resource planning''' | *'''2007 1H resource planning''' | ||
− | |||
* | * | ||
− | |||
*'''assess contribution levels and determine what is supportable. Perhaps new approaches are needed''' | *'''assess contribution levels and determine what is supportable. Perhaps new approaches are needed''' | ||
* | * | ||
− | |||
*'''assess future maintenance streams''' | *'''assess future maintenance streams''' | ||
− | |||
* | * | ||
− | |||
*'''4.4 enhancement status''' | *'''4.4 enhancement status''' | ||
** Stage 1 | ** Stage 1 | ||
Line 48: | Line 36: | ||
** Stage 2 | ** Stage 2 | ||
* | * | ||
− | |||
*'''close on 4.4 plan''' | *'''close on 4.4 plan''' | ||
* | * |
Revision as of 09:02, 9 January 2007
When a call in is active the number will be
Conference ID: 6044164
Dial in Local number: 416-343-2622
Toll-free Dial-in number: 1 866-516-6489
Agenda topics Jan 9/10/11 2007
- Deal with current issues
- 4.4 aka Europa M4 build
*
- 4.2.2
*
- 4.3.1
*
- any role changes
*
- any project structure changes
*
- 2006 in reflection
*
- review each of the project feed backs on what can be done better and what was great
* * propose use of TPTP wiki for discussion and minutes but not as a substitute for other controled forums.
- 2007 1H resource planning
*
- assess contribution levels and determine what is supportable. Perhaps new approaches are needed
*
- assess future maintenance streams
*
- 4.4 enhancement status
- Stage 1
*
- Stage 2
*
- close on 4.4 plan
*