Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TPTP Jan 07 face to face"

m (Agenda topics Jan 9/10/11 2007)
m
Line 19: Line 19:
 
     *
 
     *
 
*'''any role changes'''
 
*'''any role changes'''
 +
    * Project leads require CVS privileges for updating the TPTP website (e.g. TPTP Matrix).
 +
    * Project leads need to update each project's space on the TPTP web site.  Each project's space should be current based on the current features, architecture and user interface.  This information should drill down to more detailed functional and architectural information.
 
     * Committer matrix cleanup (no open boxes)
 
     * Committer matrix cleanup (no open boxes)
 
     *Europa packaging categories - who owns
 
     *Europa packaging categories - who owns

Revision as of 11:24, 9 January 2007

When a call in is active the number will be

Conference ID: 6044164

Dial in Local number: 416-343-2622

Toll-free Dial-in number: 1 866-516-6489

if you want to call in and the line is silent or inactive, e-mail Harm and sluiman@ca.ibm.com

Agenda topics Jan 9/10/11 2007

  • Deal with current issues
    • 4.4 aka Europa M4 build
   * TPTP builds are ready but the Europa site is not ready.
    • 4.2.2
   * Currently 24 defects targeted to 4.2.2.
   * Project leads will triage the 4.2.2 targeted defects to determine the candidate defects that are required for 4.2.2 and can be completed this week.
   * 4.2.2 will declare Microsoft Vista tolerance (as does the reaming Eclipse projects) instead of Microsoft Vista support.
    • 4.3.1
   *
  • any role changes
   * Project leads require CVS privileges for updating the TPTP website (e.g. TPTP Matrix).
   * Project leads need to update each project's space on the TPTP web site.  Each project's space should be current based on the current features, architecture and user interface.  This information should drill down to more detailed functional and architectural information.
   * Committer matrix cleanup (no open boxes)
   *Europa packaging categories - who owns
   * Documentation, website, wiki ownership and testing
  • any project structure changes
   *
  • 2006 in reflection
   *
  • review each of the project feed backs on what can be done better and what was great
   *
   * propose use of TPTP wiki for discussion and minutes but not as a substitute for other controlled forums. 
  • 2007 1H resource planning
   *
  • assess contribution levels and determine what is supportable. Perhaps new approaches are needed
   *
  • assess future maintenance streams
   *
  • defect backlog plans by project
    • Test
   *
    • Monitoring
   *
    • Trace
   *
    • Platform
   *
   *IAC
  • 4.4 enhancement status
    • Stage 1
   *
    • Stage 2
   *
   * Emma integration
  • close on 4.4 plan
   *


  • other topics
    • foundation level conformance and quality testing framework

Back to the top