Difference between revisions of "TPTP Jan 07 face to face"
m |
m (→Agenda topics Jan 9/10/11 2007) |
||
Line 11: | Line 11: | ||
*'''Deal with current issues''' | *'''Deal with current issues''' | ||
**4.4 aka Europa M4 build | **4.4 aka Europa M4 build | ||
− | * | + | * TPTP builds are ready but the Europa site is not ready. |
**4.2.2 | **4.2.2 | ||
− | * | + | * Currently 24 defects targeted to 4.2.2. |
+ | * Project leads will triage the 4.2.2 targeted defects to determine the candidate defects that are required for 4.2.2 and can be completed this week. | ||
+ | * 4.2.2 will declare Microsoft Vista tolerance (as does the reaming Eclipse projects) instead of Microsoft Vista support. | ||
**4.3.1 | **4.3.1 | ||
* | * |
Revision as of 11:14, 9 January 2007
When a call in is active the number will be
Conference ID: 6044164
Dial in Local number: 416-343-2622
Toll-free Dial-in number: 1 866-516-6489
if you want to call in and the line is silent or inactive, e-mail Harm and sluiman@ca.ibm.com
Agenda topics Jan 9/10/11 2007
- Deal with current issues
- 4.4 aka Europa M4 build
* TPTP builds are ready but the Europa site is not ready.
- 4.2.2
* Currently 24 defects targeted to 4.2.2. * Project leads will triage the 4.2.2 targeted defects to determine the candidate defects that are required for 4.2.2 and can be completed this week. * 4.2.2 will declare Microsoft Vista tolerance (as does the reaming Eclipse projects) instead of Microsoft Vista support.
- 4.3.1
*
- any role changes
* Committer matrix cleanup (no open boxes) *Europa packaging categories - who owns * Documentation, website, wiki ownership and testing
- any project structure changes
*
- 2006 in reflection
*
- review each of the project feed backs on what can be done better and what was great
* * propose use of TPTP wiki for discussion and minutes but not as a substitute for other controlled forums.
- 2007 1H resource planning
*
- assess contribution levels and determine what is supportable. Perhaps new approaches are needed
*
- assess future maintenance streams
*
- defect backlog plans by project
- Test
*
- Monitoring
*
- Trace
*
- Platform
* *IAC
- 4.4 enhancement status
- Stage 1
*
- Stage 2
* * Emma integration
- close on 4.4 plan
*
- other topics
- foundation level conformance and quality testing framework