Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "TPTP Jan 07 face to face"
m |
|||
Line 18: | Line 18: | ||
*'''any role changes''' | *'''any role changes''' | ||
* Committer matrix cleanup (no open boxes) | * Committer matrix cleanup (no open boxes) | ||
+ | *Europa packaging categories - who owns | ||
+ | * Documentation, website, wiki ownership and testing | ||
+ | |||
*'''any project structure changes''' | *'''any project structure changes''' | ||
* | * | ||
Line 41: | Line 44: | ||
**Platform | **Platform | ||
* | * | ||
+ | *IAC | ||
+ | |||
*'''4.4 enhancement status''' | *'''4.4 enhancement status''' | ||
** Stage 1 | ** Stage 1 | ||
Line 46: | Line 51: | ||
** Stage 2 | ** Stage 2 | ||
* | * | ||
+ | * Emma integration | ||
+ | |||
*'''close on 4.4 plan''' | *'''close on 4.4 plan''' | ||
* | * | ||
Line 51: | Line 58: | ||
*'''other topics''' | *'''other topics''' | ||
− | |||
− | |||
− | |||
**foundation level conformance and quality testing framework | **foundation level conformance and quality testing framework | ||
− |
Revision as of 10:40, 9 January 2007
When a call in is active the number will be
Conference ID: 6044164
Dial in Local number: 416-343-2622
Toll-free Dial-in number: 1 866-516-6489
if you want to call in and the line is silent or inactive, e-mail Harm and sluiman@ca.ibm.com
Agenda topics Jan 9/10/11 2007
- Deal with current issues
- 4.4 aka Europa M4 build
*
- 4.2.2
*
- 4.3.1
*
- any role changes
* Committer matrix cleanup (no open boxes) *Europa packaging categories - who owns * Documentation, website, wiki ownership and testing
- any project structure changes
*
- 2006 in reflection
*
- review each of the project feed backs on what can be done better and what was great
* * propose use of TPTP wiki for discussion and minutes but not as a substitute for other controlled forums.
- 2007 1H resource planning
*
- assess contribution levels and determine what is supportable. Perhaps new approaches are needed
*
- assess future maintenance streams
*
- defect backlog plans by project
- Test
*
- Monitoring
*
- Trace
*
- Platform
* *IAC
- 4.4 enhancement status
- Stage 1
*
- Stage 2
* * Emma integration
- close on 4.4 plan
*
- other topics
- foundation level conformance and quality testing framework