Attendees
- Present:
- Alex Nan
- Hariharan Narayanan
- Rohit Shetty
- Yasuhisa Gotoh
- Absent:
- Richard Yun Song Huang - on vacation
4.4.1
- Rohit, Hari, Gotoh-san and Richard finished their tests and checked in the results
- Alex still has to complete Monitor.CommonServices, Monitor.Doc.Smoke (by the time the notes are written all tests have been executed and checked in)
- Linux monitoring agents and remote log import failing because of bug 217035
- no problems found in the monitoring project components
- need to retest the failing scenario with the new driver
- Richard on vacation, Matt is backing him up for TP2
4.5
- Alex completed bug 212807, bug 104281, bug 181285, bug 201975, bug 212807
- Alex couldn't contain bug 148272,bug 192250, these will be deferred to i6
- Rohit completed bug 182872, bug 199417, bug 208679
- bug 164039 requires build changes and couldn't be contained in i5, will be deferred to i6
- Hari created patch for bug 185625 and Alex checked in the code
- Hari raised issues that the remaining manual MAX tests may not be possible to be automated because of AGR limitations
- no clarification from Richard on the status of bug 212806 and bug 210785, will need to check with Matt
- bug 184530 couldn't be contained in i5, will be moved to i6
- any defect that couldn't be contained in i5 will be either moved to i6 or i7.
- Alex thinks that all the remaining defects cannot be contained in i6
- the team will need to concentrate in i6 to bring down the number of defects on the Log and Trace Analyzer now that the features are done
- all the remaining automation defects will need to be done ASAP, this work item cannot drag anymore
- the monitoring project doesn't have except one critical defect owned by Richard bug 210785, any high severity defects, from this point of view the project is in pretty good shape
- Alex mentioned that end of i6 development is API freeze (03/14/2008) and end of i6 is PII freeze (04/04/2008)
- doc changes are still allowed after 04/04/2008 but it is good practice to check in the major doc changes by 04/04/2008 (M6)
- last doc drop before GA: Doc3 06/10/2008
Action items
- team to retest failing 4.4.1 scenarios by Friday Feb 8th, 2008 end of day, once the TP2 driver is announced
- Alex to move all the remaining i5 defects to i6 or i7
- Alex to contact Matt with regard to 4.4.1 TP2 and 4.5 TP1
- Rohit to retest the remote import log scenarios on Linux
- Gotoh-san to complete as soon as possible the symptom automation defect bug 207251
- Hari to clarify if automating the manual MAX test cases (bug 180950) is possible
- team to start 4.5 i5 TP1 testing once the candidate driver is announced