Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "TPTP-Monitoring-Tools-20071106"
(→4.5) |
(→4.5) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
** Rohit Shetty | ** Rohit Shetty | ||
* Absent: | * Absent: | ||
− | ** Hariharan Narayanan | + | ** Hariharan Narayanan - on vacation |
== 4.4.1 == | == 4.4.1 == | ||
Line 20: | Line 20: | ||
* still an outstanding test suite to run Monitor.UI.Common.Services | * still an outstanding test suite to run Monitor.UI.Common.Services | ||
* some of the BTM test results were not checked into CVS yet | * some of the BTM test results were not checked into CVS yet | ||
+ | * iteration numbers have shifted out by 2 to align with the Eclipse Ganymede milestone numbers | ||
+ | ** Alex has updated i2 and i3 targetted defects to i4 and i5 | ||
* work in progress on [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207240 207240] | * work in progress on [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207240 207240] | ||
* work in progress on [https://bugs.eclipse.org/bugs/show_bug.cgi?id=208586 208586] | * work in progress on [https://bugs.eclipse.org/bugs/show_bug.cgi?id=208586 208586] | ||
* in TP2 we will run only a smoke test since no defects were fixed in TP1 | * in TP2 we will run only a smoke test since no defects were fixed in TP1 | ||
− | * in the remaining spare to try finishing the test case automation work | + | * in the remaining spare time to try finishing the test case automation work |
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207251 207251] | ** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207251 207251] | ||
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207253 207253] | ** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207253 207253] | ||
Line 29: | Line 31: | ||
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207255 207255] | ** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207255 207255] | ||
* new defects have been opened by Marius to track the work for the features [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200138 200138], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200139 200139] | * new defects have been opened by Marius to track the work for the features [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200138 200138], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200139 200139] | ||
− | |||
* new defects have been opened, reported by a consuming product: | * new defects have been opened, reported by a consuming product: | ||
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207763 207763] | ** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207763 207763] | ||
− | [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207806 207806] | + | ** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207806 207806] |
** could be potential 4.4.1 candidates | ** could be potential 4.4.1 candidates | ||
** consuming product will likely request a patch on TPTP4.2.2 | ** consuming product will likely request a patch on TPTP4.2.2 | ||
+ | * after TP2 the focus should be on reducing the backlog of defects and feature work | ||
== Action items == | == Action items == |
Latest revision as of 22:39, 7 November 2007
Contents
Attendees
- Present:
- Alex Nan
- Yasuhisa Gotoh
- Richard Yun Song Huang
- Rohit Shetty
- Absent:
- Hariharan Narayanan - on vacation
4.4.1
- Rohit checked in the fix for 202983
- Alex fixed 205837
- added readme entry 207044 for the problem investigated in 202715
- Alex hasn't finished 206665 yet
- assigned 206260 to Rohit
4.5
- 4.5 i3 TP1 finished
- still an outstanding test suite to run Monitor.UI.Common.Services
- some of the BTM test results were not checked into CVS yet
- iteration numbers have shifted out by 2 to align with the Eclipse Ganymede milestone numbers
- Alex has updated i2 and i3 targetted defects to i4 and i5
- work in progress on 207240
- work in progress on 208586
- in TP2 we will run only a smoke test since no defects were fixed in TP1
- in the remaining spare time to try finishing the test case automation work
- new defects have been opened by Marius to track the work for the features 200138, 200139
- new defects have been opened, reported by a consuming product:
- after TP2 the focus should be on reducing the backlog of defects and feature work
Action items
- Richard to check in the remaining BTM test results
- Rohit to fix 206260 as soon as possible
- Alex to finish 206665 as soon as possible
- Alex in collaboration with Joel and Samson to finish 208586
- Alex to define the smoke test content (at the time these notes are written this is already done)
- Alex (with Marius) to finish work on 207240
- finish TP2 by Friday November 9, 2007 (worse case by Tuesday November 13, 2007)