Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Milestone 1.0M9"

(Architecture)
(Architecture)
Line 6: Line 6:
 
==Cross Cutting Concerns==
 
==Cross Cutting Concerns==
 
===Architecture===
 
===Architecture===
The expectation is that M0.9 represents finalized architecture for 1.0. (i.e. there will be no new interfaces, etc.)
+
The expectation is that M0.9 represents finalized architecture for 1.0. (i.e. there will be no new component-level interfaces, etc.)
 
* IdAS Registry  - finalize design
 
* IdAS Registry  - finalize design
 
* CardStoreStrategy - finalize design
 
* CardStoreStrategy - finalize design

Revision as of 12:56, 19 July 2007

  • Original Date June 15
  • Revised Date July 27th

Focus is on architectural adjustments, builds and clean-up prior to final packaging, API review, testing, cleanup, etc.

Cross Cutting Concerns

Architecture

The expectation is that M0.9 represents finalized architecture for 1.0. (i.e. there will be no new component-level interfaces, etc.)

  • IdAS Registry - finalize design
  • CardStoreStrategy - finalize design

Deployments

  • H3 issues (we're trying to get as many as possible of these done for the June Catalyst demo)
    1. Can import MSFT CardSpace format personal cards (.crds files)
    2. Need a user friendly way of importing a .crd file --e.g. double click on .crd file
    3. Requires installation of tomcat (unacceptable complexity)
    4. Total size too large at approx 50+ MB

Components

Each Component owner should add a link to the M0.9 "to do list" for their component:

  • HBX
  • I-Card Manager
  • RPPS Web app
  • RPPS Core
  • ISS
  • Token Service TS ToDo
  • IdAS: IdAS ToDo
  • IdAS JNDI CP
  • IdAS Jena CP

Links

Back to the top