Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Equinox Minutes - 20090908"
(→Agenda) |
|||
Line 18: | Line 18: | ||
** Need to get input from Martin on Weaving plan. | ** Need to get input from Martin on Weaving plan. | ||
* e4 compatibility | * e4 compatibility | ||
+ | ** OSGi in the context of e4. | ||
+ | *** What cleanup can we do in e4. | ||
+ | *** Remove old stuff | ||
+ | **** plug-in converter, can that be a compatibility fragment. | ||
+ | *** Logging | ||
+ | **** Do we want to logging bundle in the framework? Perhaps as a framework fragment? | ||
+ | **** Our tracing service is looking very close to extended log service. | ||
+ | *** Console | ||
+ | **** Can we split this out into another bundle or framework fragment. | ||
+ | *** Improve our programming model to make it easier to use? | ||
+ | *** R5 OSGi, what are the implications to the code base. | ||
+ | ** What about removing core.runtime | ||
+ | *** Move branding API into app bundle. | ||
+ | ** Adopt DS everywhere to avoid Platform API, or some other injection method. | ||
+ | *** Use p2 as an example for injection. Is DS powerful enough. | ||
+ | *** EventAdmin added to RCP, it needs to be activated. Can it use DS. | ||
+ | **** Issues for scenarios that do not use DS | ||
+ | **** Need code pattern that works when DS is present and when it is not. | ||
* GSOC | * GSOC |
Revision as of 11:01, 8 September 2009
Attendees
- Tom
- John
- Pascal
- Jeff
- Simon
- DJ
Agenda
- 3.6 Planning [http://www.eclipse.org/projects/project-plan.php?planurl=http://www.eclipse.org/equinox/planning
/equinox_helios_plan_XXX_IN_PROGRESS.xml draft plan]
- EclipseSource will do some work in server-side to make it easier to use
- EclipseSource ease of use issues with p2. Make it easier to assemble a solution.
- Multi-locale support with help from EclipseSource
- Are our plan items too fine grain.
- We should have a more general item that we can group these items under. Gives a more clear message.
- Use bug reports to capture more fine grained work.
- Need to get input from Martin on Weaving plan.
- e4 compatibility
- OSGi in the context of e4.
- What cleanup can we do in e4.
- Remove old stuff
- plug-in converter, can that be a compatibility fragment.
- Logging
- Do we want to logging bundle in the framework? Perhaps as a framework fragment?
- Our tracing service is looking very close to extended log service.
- Console
- Can we split this out into another bundle or framework fragment.
- Improve our programming model to make it easier to use?
- R5 OSGi, what are the implications to the code base.
- What about removing core.runtime
- Move branding API into app bundle.
- Adopt DS everywhere to avoid Platform API, or some other injection method.
- Use p2 as an example for injection. Is DS powerful enough.
- EventAdmin added to RCP, it needs to be activated. Can it use DS.
- Issues for scenarios that do not use DS
- Need code pattern that works when DS is present and when it is not.
- OSGi in the context of e4.
- GSOC