Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Equinox/Meeting Minutes/20101206"

(New page: ==Attendees== * Jeff ==Agenda== * p2 publishing of products and features)
 
 
Line 1: Line 1:
 
==Attendees==
 
==Attendees==
 
* Jeff
 
* Jeff
 +
* DJ
 +
* Tom
 +
* Andrew
 +
* Dean
 +
* John R
 +
* Ian (struggling with the mute button)
  
 
==Agenda==
 
==Agenda==
  
 
* p2 publishing of products and features
 
* p2 publishing of products and features
 +
* New and noteworthy for M4
 +
* Coordinator
 +
 +
== p2 publishing==
 +
* There are a number of things that PDE build does in the process of "building" a feature/product that others (non-PDE folks) would like to do
 +
* Much of this is related to p2 publishing
 +
* The p2 team is seeing a number of bug reports against the p2 product publisher as well as missing parts of feature publishing
 +
* [https://issues.sonatype.org/browse/TYCHO-520 Tycho-520 bug] has a number of details
 +
* lots of discussion in the call.  We agreed that there is some potential to refactor the Eclipse / p2 parts of publishing/building (respectively) into some bundle that extends the base p2 publisher and can be used be PDE, Tycho, Buckminster, Ant/Ivy folks, ...
 +
* Jeff to put something on p2-dev to see what folks think
 +
 +
== M4 New and noteworthy==
 +
* People should proactively
 +
* some core framework changes to be noted
 +
* p2 topics?
 +
** space numbers
 +
** licensing improvements
 +
** new space stuff uses perm gen space so there may be some side-effects.
 +
 +
== Coordinator ==
 +
* new spec form OSGi for lightweight transaction-like behaviour
 +
* John R was doing well on the implementation but the spec changed
 +
* delivery will be delayed until M5
 +
* Equinox impl may be the RI.  Not sure at this point

Latest revision as of 17:01, 6 December 2010

Attendees

  • Jeff
  • DJ
  • Tom
  • Andrew
  • Dean
  • John R
  • Ian (struggling with the mute button)

Agenda

  • p2 publishing of products and features
  • New and noteworthy for M4
  • Coordinator

p2 publishing

  • There are a number of things that PDE build does in the process of "building" a feature/product that others (non-PDE folks) would like to do
  • Much of this is related to p2 publishing
  • The p2 team is seeing a number of bug reports against the p2 product publisher as well as missing parts of feature publishing
  • Tycho-520 bug has a number of details
  • lots of discussion in the call. We agreed that there is some potential to refactor the Eclipse / p2 parts of publishing/building (respectively) into some bundle that extends the base p2 publisher and can be used be PDE, Tycho, Buckminster, Ant/Ivy folks, ...
  • Jeff to put something on p2-dev to see what folks think

M4 New and noteworthy

  • People should proactively
  • some core framework changes to be noted
  • p2 topics?
    • space numbers
    • licensing improvements
    • new space stuff uses perm gen space so there may be some side-effects.

Coordinator

  • new spec form OSGi for lightweight transaction-like behaviour
  • John R was doing well on the implementation but the spec changed
  • delivery will be delayed until M5
  • Equinox impl may be the RI. Not sure at this point

Back to the top