Difference between revisions of "DTP PMC and Project Lead Meeting: September 10, 2007"

(New page: ← Back to DTP PMC and Project Lead Meeting page ==Attendees== ==Regrets== ==Agenda== *Note that DTP 1.6 ("Ganymede") builds are now being poste...)
 
Line 11: Line 11:
 
**Two PMC members' approval allows bug fix to proceed
 
**Two PMC members' approval allows bug fix to proceed
 
*Review of project plans linked to [[DTP_Ganymede_Project_Plan | DTP 1.6 high-level plan]]
 
*Review of project plans linked to [[DTP_Ganymede_Project_Plan | DTP 1.6 high-level plan]]
 +
*How to proceed toward committed plans on 10/1 (M)
 +
**Add as much detail as possible to existing items
 +
**Add BZ entries (at least one per item) for each point in plan
 +
**Set target milestones for BZ entries
 +
**Team review and, if possible, approval on 10/1
 
==Minutes==
 
==Minutes==
  
 
==Action Items==
 
==Action Items==

Revision as of 11:58, 10 September 2007

Back to DTP PMC and Project Lead Meeting page

Attendees

Regrets

Agenda

  • Note that DTP 1.6 ("Ganymede") builds are now being posted
  • Note that tomorrow (9/11) is the last "open" DTP 1.5.1 build
    • Builds between 9/12 (W) and 9/26 (W) only when approved bugs are resolved
    • Use PMC approval flags in bug to notify PMC about request
    • Two PMC members' approval allows bug fix to proceed
  • Review of project plans linked to DTP 1.6 high-level plan
  • How to proceed toward committed plans on 10/1 (M)
    • Add as much detail as possible to existing items
    • Add BZ entries (at least one per item) for each point in plan
    • Set target milestones for BZ entries
    • Team review and, if possible, approval on 10/1

Minutes

Action Items