Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DSDP/TM/Meetings/2-Jun-2010"

< DSDP‎ | TM‎ | Meetings
(New page: {|border=1 cellspacing=0 cellpadding=4 | Meeting Title: | '''TM Monthly Meeting''' |- | Date & Time: | Wednesday Jun 2, 2010 at [http://www.timeanddate.com/worldclock/fixedtime.html?m...)
 
Line 37: Line 37:
  
 
* Last [[DSDP/TM/Meetings/5-May-2010]]
 
* Last [[DSDP/TM/Meetings/5-May-2010]]
 +
* Martin: 3.2 (Helios) release - we are pretty much done. New & Noteworthy will be on the Wiki this year.
 +
** Athena / CBI will not be used due to issues. Glad we have legacy builder. Local Terminal might not go to Helios coordinated Repo (only TM).
 +
** Dave M: {{bug|315333}} dstore certificate chaining: should be OK for RC4 with Dave M + Martin as reviewers. Observe the [[DSDP/TM/3.2 Ramp down Plan]].
 +
** Dave D: Next meeting Jul - should we open a branch for 3.2.1 right away?
 +
*** Branch in the Repo is sufficient, don't need a Build.
 +
*** Exchange E-Mail when it's known that branch exist.
 +
*** Temporary branch now, merge to main after 3.2 is out, work in main over the summer.
  
* Martin: [http://download.eclipse.org/dsdp/tm/downloads/drops/S-3.2M7-201005032039/index.php TM 3.2M7] released
+
* Plans for next year
** Obey the [[DSDP/TM/3.2 Ramp down Plan]]. Please try to have everything done beginning of June. Only work on Hi-pri fixes.
+
** Wind River - no plans for RSE, little improvements to Terminal, TCF separate project. Shooting for TM 3.3 makes sense.
** Changes to Unittests and Docs are always OK.
+
** Mentor - similar to WR.
** {{Bug|311447}} Import source from CVS is cool for end-users to contribute patches. See also also the [http://download.eclipse.org/eclipse/downloads/drops/S-3.6M7-201004291549/eclipse-news-M7.html#importcvs Eclipse 3.6M7 Import from CVS] New and Noteworthy!
+
** IBM - no statement.
** [http://www.eclipse.org/projects/project-plan.php?projectid=dsdp.tm Project Plan] initially updated
+
** Slightly more work on [[Helios]] must-have items needed, but not bad
+
** Bugzilla 3.3 Milestone added
+
** '''AI All''' please review / reassign bugs assigned an old target milestone.
+
* Dave M - no updates
+
* Anna - want to add I-builds and promotions to Athena
+
* Xuan - want a p2 driver, where are the update sites?
+
** Nightlies and I-builds generate http://download.eclipse.org/dsdp/tm/testUpdates and http://download.eclipse.org/dsdp/tm/signedUpdates
+
** 3.1.x M-builds generate http://download.eclipse.org/dsdp/tm/testPatchUpdates and http://download.eclipse.org/dsdp/tm/signedPatchUpdates
+
** 3.0.x L-builds gneerate http://download.eclipse.org/dsdp/tm/testLegacyUpdates and http://download.eclipse.org/dsdp/tm/signedLegacyUpdates
+
** 3.2 Milestones (S-builds) generate http://download.eclipse.org/dsdp/tm/updates/3.2milestones
+
* Dave D - will look at the backlog and reassign
+
  
* Athena Builds:
+
* 3.2.1 / Unittest commitment
** Missing features: I-builds and promoting (on Anna's List)
+
** WR interested in top stable 3.2.1 -- would like commitment to actually fix unittest issues.
** Recent builder changes, i.e. use the right basebuilder and set generateSourceReferences=true
+
** Helios (3.2) is green on 115 tests now. Enabling tests for additional connection types (SSH, FTP, DStore) shows lots of bugs though.
 +
** Can we get committment to fixing these? Or are we plainly focused on user-reported errors?
 +
** Dave D: I think an investment in making the current unit tests run in connected environments is a good idea.
 +
** All agree.
  
 
<!--
 
<!--
 
=== Committer Status ===
 
=== Committer Status ===
 +
* Dave M - no updates
 +
* Anna - want to add I-builds and promotions to Athena
 +
* Xuan - want a p2 driver, where are the update sites?
 
* Martin
 
* Martin
** Done Work:
 
*** Bugzilla 3.1.2+ target milestone created - '''AI All''': Triage/Reassign bugs assigned a 3.1.x target milestone
 
 
** FYI: {{Bug|196176}} Rado's deferred D&D declined by SWT for 3.6 although I pinged them. Java7 going to provide something for deferred DND
 
** FYI: {{Bug|196176}} Rado's deferred D&D declined by SWT for 3.6 although I pinged them. Java7 going to provide something for deferred DND
 
** Please review Community contributions.
 
** Please review Community contributions.
Line 103: Line 102:
 
== Vacations ==
 
== Vacations ==
 
* Martin - Maybe out of office in June
 
* Martin - Maybe out of office in June
 +
* Dave D - Maybe some beginning July, short bursts
 +
* Dave M - End July / 1st week August
 +
* Anna - Last week June
  
 
== Action Items ==
 
== Action Items ==

Revision as of 13:32, 2 June 2010

Meeting Title: TM Monthly Meeting
Date & Time: Wednesday Jun 2, 2010 at 1620 UTC / 1220pm Toronto
Html.gifHTML | Ical.gifiCal
Dial-in: Martin to call everybody by Skype
Interested Parties ping martin.oberhuber on Skype Chat for getting added to the call.

Backup dial-in: Freephone +1 (866) 8693090 / Passcode: 0587322148 #
Austria 01 928 7547 / Russia 81080029331012 / Germany 069222216110

Skype dial-in: martin.oberhuber, ddykstal (or david_dykstal), david-k-mcknight, kevin.j.doyle, xuan.chen886, eugenetarassov, michael_scharf, uwe.stieber, radoslav.gerganov, wrsfburton, anna_dushistova.

Attendees

  • Dave D, Dave M, Xuan, Anna, Martin


Agenda

  • Last DSDP/TM/Meetings/5-May-2010
  • Martin: 3.2 (Helios) release - we are pretty much done. New & Noteworthy will be on the Wiki this year.
    • Athena / CBI will not be used due to issues. Glad we have legacy builder. Local Terminal might not go to Helios coordinated Repo (only TM).
    • Dave M: bug 315333 dstore certificate chaining: should be OK for RC4 with Dave M + Martin as reviewers. Observe the DSDP/TM/3.2 Ramp down Plan.
    • Dave D: Next meeting Jul - should we open a branch for 3.2.1 right away?
      • Branch in the Repo is sufficient, don't need a Build.
      • Exchange E-Mail when it's known that branch exist.
      • Temporary branch now, merge to main after 3.2 is out, work in main over the summer.
  • Plans for next year
    • Wind River - no plans for RSE, little improvements to Terminal, TCF separate project. Shooting for TM 3.3 makes sense.
    • Mentor - similar to WR.
    • IBM - no statement.
  • 3.2.1 / Unittest commitment
    • WR interested in top stable 3.2.1 -- would like commitment to actually fix unittest issues.
    • Helios (3.2) is green on 115 tests now. Enabling tests for additional connection types (SSH, FTP, DStore) shows lots of bugs though.
    • Can we get committment to fixing these? Or are we plainly focused on user-reported errors?
    • Dave D: I think an investment in making the current unit tests run in connected environments is a good idea.
    • All agree.


Bugzilla status



Vacations

  • Martin - Maybe out of office in June
  • Dave D - Maybe some beginning July, short bursts
  • Dave M - End July / 1st week August
  • Anna - Last week June

Action Items

  • Last DSDP/TM/Meetings/5-May-2010
  • Everyone old Fix target milestone of (old milestone) assigned bugs.
  • DaveM: old bug 199596 Read-Only attribute doesn't always update IRemoteFile;
  • Martin: Create project plan, old 3.1.1 assigned bugs; bug 256581 SSH performance; bug 240991, bug 239230 Early startup
  • Anna: old new builder based on CBI tutorial
  • Xuan: old Look at bug 230917 Archive Handler Unittests
  • DaveD: old Create bug for partial model export; bug 238574 Make new website available and E-mail questions on mailinglist

Next Meeting

Copyright © Eclipse Foundation, Inc. All Rights Reserved.