Difference between revisions of "4.5 Test Automation Initiative"
(→Members) |
(→Benefits) |
||
Line 22: | Line 22: | ||
* Decrease time/cost to resolve defects since uncovered earlier in the code-test-build cycle. | * Decrease time/cost to resolve defects since uncovered earlier in the code-test-build cycle. | ||
* Decrease testing overlap by a) localizing test executing and reporting to one group and b) using code coverage statistics. | * Decrease testing overlap by a) localizing test executing and reporting to one group and b) using code coverage statistics. | ||
+ | |||
+ | == Deliver dates == | ||
+ | |||
+ | * October 31: | ||
+ | ** Complete the testing process, extending the existing TPTP Testing Strategy. | ||
+ | ** Profiler test suite automation. | ||
+ | |||
+ | * November 14: | ||
+ | ** Proof of concept (PoC) for integration of ASF and TPTP builds for PMC approval and integrate with TPTP builds. | ||
+ | ** Presentation to TPTP committers. | ||
+ | ** Measure cost savings. | ||
+ | |||
+ | * November 28: | ||
+ | ** Each project automates their manual test suites and converge existing automated test suites over time to leverage the test infrastructure. | ||
+ | ** Measure cost savings. | ||
+ | ** Report cost savings to PMC. | ||
== Meeting Minutes == | == Meeting Minutes == |
Revision as of 09:11, 31 October 2007
Members
- Paul Slauenwhite (IBM)
- Alan Haggarty (IBM)
- Joel Cayne (IBM)
- Jonathan West (IBM)
- Joanna Kubasta (IBM)
- Kiryl Kazakevich (Intel)
Goals
- Consolidation of our testing process, and infrastructure.
- Consolidation of custom test frameworks (Test Dashboard, AC/Profiler test server, variants).
- Reuse of Test Project framework (ASF, reporting, etc.) and tools (AGR, JUnit, etc.).
- Automatic test execution and report generation with every build (BVT).
Benefits
- Specialization of testing skills (e.g. builds).
- Provide an infrastructure that makes it easy for committers to contribute automated test cases/suites.
- Manual labor savings by using automated tests, which are automatically executed with every build.
- Decrease time/cost to resolve defects since uncovered earlier in the code-test-build cycle.
- Decrease testing overlap by a) localizing test executing and reporting to one group and b) using code coverage statistics.
Deliver dates
- October 31:
- Complete the testing process, extending the existing TPTP Testing Strategy.
- Profiler test suite automation.
- November 14:
- Proof of concept (PoC) for integration of ASF and TPTP builds for PMC approval and integrate with TPTP builds.
- Presentation to TPTP committers.
- Measure cost savings.
- November 28:
- Each project automates their manual test suites and converge existing automated test suites over time to leverage the test infrastructure.
- Measure cost savings.
- Report cost savings to PMC.