Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Equinox Minutes - 20080909
Revision as of 14:13, 9 September 2008 by Unnamed Poltroon (Talk) (New page: == Galileo Planning == * Equinox plan needs to be created in standard form * Equinox components should have a draft of their component plan ready for next week * Aim to finalize Equinox p...)
Galileo Planning
- Equinox plan needs to be created in standard form
- Equinox components should have a draft of their component plan ready for next week
- Aim to finalize Equinox plan by end of September