Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Babel / Development Status Meetings / 2009-06-15"
(New page: === Attendees === {| border="1" | Kit || |- | Denis || |- | Gabe || |- | Antoine || |- | Nigel || |- | Jeff || |- | Margaret || |} === Top...) |
(→Topics) |
||
Line 18: | Line 18: | ||
=== Topics === | === Topics === | ||
*Babel Developer Downloads site | *Babel Developer Downloads site | ||
− | **[http://build.eclipse.org/technology/babel/babel_language_packs/ Babel Developer Downloads] site is looking good | + | **Structure of [http://build.eclipse.org/technology/babel/babel_language_packs/ Babel Developer Downloads] site is looking good |
**N-builds, I-builds, and RC1 build are listed properly | **N-builds, I-builds, and RC1 build are listed properly | ||
− | ** | + | **Babel update sites are in "test-updates" folder, e.g. http://build.eclipse.org/technology/babel/test-updates/RC1/galileo/ |
− | ** | + | **"test-updates" doesn't sound very official, should we rename that at least for the GA version? |
− | ** | + | *Build status |
− | * | + | **Bug fixed - {{bug|279485}} Language pack links are broken |
− | ** | + | **I thought the Babel Galileo Update Site we produced already had the XSL transformation done |
− | **I | + | **Now I remember a conversation from Denis that we had the transformation disabled because it was taking too long |
− | ** | + | **Denis, please confirm |
− | *p2 metadata | + | **I ran the p2 publisher manually to produce the p2 repository. After that, I ran the XSL transformation. I tested the p2 repository produced. I installed the Babel language packs onto "eclipse-SDK-3.5RC4-win32.zip" and "eclipse-jee-galileo-RC3-win32.zip". All the language packs installed cleanly with no error messages in the .log file. Uninstalling the language packs were also successful with no error messages. |
+ | **I think I have produced a good p2 repository for the Babel Galileo Update Site for the RC1 build. Everyone, please try this update site: http://build.eclipse.org/technology/babel/test-updates/RC1/galileo/ | ||
+ | *RC2 status | ||
+ | **I20090614-0400 finished | ||
+ | **I will run the p2 publisher (which will take about 15 hours to finish) and the XSL transform against the build manually | ||
+ | **I will perform a smoke test on the update sites and language packs | ||
+ | **If everything is okay, we can rename I20090614-0400 to RC2 on Thursday or Friday | ||
+ | **We will exercise the same process next week and declare Golden Master next Friday, June 26th | ||
+ | **Denis, can we start the I-build on Friday morning or Saturday morning so I can run the p2 publisher and transform processes during the weekend and have a build ready next Monday? | ||
+ | *work items | ||
+ | **p2 metadata generator is deprecated, we should use p2 publisher | ||
+ | **Possible to port the p2 metadata generator to p2 publisher? | ||
+ | **Need to integrate the p2 publisher step and XSL transformation step into the build process | ||
[[Category:Babel]] | [[Category:Babel]] |
Revision as of 12:17, 15 June 2009
Attendees
Kit | |
Denis | |
Gabe | |
Antoine | |
Nigel | |
Jeff | |
Margaret |
Topics
- Babel Developer Downloads site
- Structure of Babel Developer Downloads site is looking good
- N-builds, I-builds, and RC1 build are listed properly
- Babel update sites are in "test-updates" folder, e.g. http://build.eclipse.org/technology/babel/test-updates/RC1/galileo/
- "test-updates" doesn't sound very official, should we rename that at least for the GA version?
- Build status
- Bug fixed - bug 279485 Language pack links are broken
- I thought the Babel Galileo Update Site we produced already had the XSL transformation done
- Now I remember a conversation from Denis that we had the transformation disabled because it was taking too long
- Denis, please confirm
- I ran the p2 publisher manually to produce the p2 repository. After that, I ran the XSL transformation. I tested the p2 repository produced. I installed the Babel language packs onto "eclipse-SDK-3.5RC4-win32.zip" and "eclipse-jee-galileo-RC3-win32.zip". All the language packs installed cleanly with no error messages in the .log file. Uninstalling the language packs were also successful with no error messages.
- I think I have produced a good p2 repository for the Babel Galileo Update Site for the RC1 build. Everyone, please try this update site: http://build.eclipse.org/technology/babel/test-updates/RC1/galileo/
- RC2 status
- I20090614-0400 finished
- I will run the p2 publisher (which will take about 15 hours to finish) and the XSL transform against the build manually
- I will perform a smoke test on the update sites and language packs
- If everything is okay, we can rename I20090614-0400 to RC2 on Thursday or Friday
- We will exercise the same process next week and declare Golden Master next Friday, June 26th
- Denis, can we start the I-build on Friday morning or Saturday morning so I can run the p2 publisher and transform processes during the weekend and have a build ready next Monday?
- work items
- p2 metadata generator is deprecated, we should use p2 publisher
- Possible to port the p2 metadata generator to p2 publisher?
- Need to integrate the p2 publisher step and XSL transformation step into the build process