Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "WTP 2008-06-25"
(→Bug Lists to Ramp Down) |
(→Bug Lists for 3.0.1) |
||
(13 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
|width="80%"|Konstantin || | |width="80%"|Konstantin || | ||
|- | |- | ||
− | |Tim || | + | |Tim || Y |
|- | |- | ||
− | |Nitin || | + | |Nitin || Y |
|- | |- | ||
|Kathy || | |Kathy || | ||
|- | |- | ||
− | |Chuck || | + | |Chuck || Y |
|- | |- | ||
|Naci || | |Naci || | ||
|- | |- | ||
− | |Raghu || | + | |Raghu || Y |
|- | |- | ||
− | |Neil || | + | |Neil || Y |
|- | |- | ||
− | |David || | + | |David || Y |
|- | |- | ||
− | |Helen || | + | |Helen || Y |
|- | |- | ||
|Philippe || | |Philippe || | ||
Line 35: | Line 35: | ||
|width="80%"|Bob || | |width="80%"|Bob || | ||
|- | |- | ||
− | |Carl || | + | |Carl || Y |
|- | |- | ||
|Dave || | |Dave || | ||
|- | |- | ||
− | |Phil || | + | |Phil || Y |
|- | |- | ||
− | |Kaloyan|| | + | |Kaloyan|| Y |
|- | |- | ||
|Larry|| | |Larry|| | ||
|- | |- | ||
− | |Amy|| | + | |Amy|| Y |
|- | |- | ||
− | |Kate|| | + | |Kate|| Y |
|- | |- | ||
− | |Angel|| | + | |Angel|| Y |
|- | |- | ||
|Brad|| | |Brad|| | ||
Line 70: | Line 70: | ||
[http://www.eclipse.org/webtools/releases/3.0.0/ WTP 3.0 released!] | [http://www.eclipse.org/webtools/releases/3.0.0/ WTP 3.0 released!] | ||
Congratulations & Thanks everyone! | Congratulations & Thanks everyone! | ||
+ | |||
+ | [http://dev.eclipse.org/mhonarc/lists/wtp-pmc/msg01437.html Marking bugs for official patch] | ||
No meeting next week 07/03/2008 | No meeting next week 07/03/2008 | ||
Line 75: | Line 77: | ||
===Focus on Requirements Planning (Raghu)=== | ===Focus on Requirements Planning (Raghu)=== | ||
− | : Raghu: | + | *Minutes: |
+ | :Raghu: main wiki page for the next release => next Thursday | ||
+ | :July 21st: 1st round of enhancement, add a 'Plan' keyword in bugzilla | ||
+ | :Project plan in a standard format | ||
+ | :Final cut for plan document August 22nd | ||
+ | :Instructions will be posted on the wiki page | ||
== WTP 2.0.3 == | == WTP 2.0.3 == | ||
Line 90: | Line 97: | ||
*Smoketest | *Smoketest | ||
+ | |||
+ | *Minutes: | ||
+ | : Proposed schedule is official | ||
+ | : smoketest will be issued tomorrow morning and driver to declare later in the day | ||
== WTP 3.0 == | == WTP 3.0 == | ||
Line 99: | Line 110: | ||
=== Bug Lists === | === Bug Lists === | ||
− | + | :[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=target_milestone&y_axis_field=bug_severity&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=ATF&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0+M1&target_milestone=3.0+M2&target_milestone=3.0+M3&target_milestone=3.0+M4&target_milestone=3.0+M5&target_milestone=3.0+M6&target_milestone=3.0+M7&target_milestone=3.0+RC1&target_milestone=3.0+RC2&target_milestone=3.0+RC3&target_milestone=3.0+RC4&target_milestone=3.0+RC5&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&resolution=FIXED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= 3.0 JST, WST, JSF Bugs Fixed] (~1101) | |
− | + | :[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=target_milestone&y_axis_field=bug_severity&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&target_milestone=2.0+M1&target_milestone=2.0+M2&target_milestone=2.0+M3&target_milestone=2.0+M4&target_milestone=2.0+M5&target_milestone=2.0+M6&target_milestone=2.0+M7&target_milestone=2.0+RC1&target_milestone=2.0+RC2&target_milestone=2.0+RC3&target_milestone=2.0+RC4&target_milestone=2.0+RC5&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&resolution=FIXED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= 3.0 JPT Dali Bugs Fixed] (~229) | |
− | :[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=product&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=2.0&target_milestone=2.0+RC1&target_milestone=2.0+RC0&target_milestone=2.0+RC2&target_milestone=2.0+RC3&target_milestone=2.0+RC4&target_milestone=3.0&target_milestone=3.0+RC1&target_milestone=3.0+RC2&target_milestone=3.0+RC3&target_milestone=3.0+RC4&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= All Remaining Targeted Enhancements] (~ | + | :[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=product&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=2.0&target_milestone=2.0+RC1&target_milestone=2.0+RC0&target_milestone=2.0+RC2&target_milestone=2.0+RC3&target_milestone=2.0+RC4&target_milestone=3.0&target_milestone=3.0+RC1&target_milestone=3.0+RC2&target_milestone=3.0+RC3&target_milestone=3.0+RC4&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= All Remaining Targeted Enhancements] (~1) |
:[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=target_milestone&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=2.0+RC&target_milestone=2.0+RC0&target_milestone=2.0+RC1&target_milestone=2.0+RC0&target_milestone=2.0+RC2&target_milestone=2.0+RC3&target_milestone=2.0+RC4&target_milestone=2.0.0&target_milestone=2.0.0+M1&target_milestone=2.0.0+M2&target_milestone=2.0.0+M3&target_milestone=2.0.0+M4&target_milestone=2.0.0+M5&target_milestone=2.0.0M1&target_milestone=2.0.0M4&target_milestone=2.0.0M5&target_milestone=2.0.0M6&target_milestone=2.0.0M7&target_milestone=2.0.0RC1&target_milestone=2.0.0RC2&target_milestone=3.0&target_milestone=3.0+M7&target_milestone=3.0+RC1&target_milestone=3.0+RC2&target_milestone=3.0+RC3&target_milestone=3.0+RC4&target_milestone=3.0.0&target_milestone=2.0+RC0&target_milestone=2.0+RC1&target_milestone=3.0&target_milestone=3.0+M7&target_milestone=3.0+RC1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= Remaining Targeted Bugs] (~6) | :[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=target_milestone&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=2.0+RC&target_milestone=2.0+RC0&target_milestone=2.0+RC1&target_milestone=2.0+RC0&target_milestone=2.0+RC2&target_milestone=2.0+RC3&target_milestone=2.0+RC4&target_milestone=2.0.0&target_milestone=2.0.0+M1&target_milestone=2.0.0+M2&target_milestone=2.0.0+M3&target_milestone=2.0.0+M4&target_milestone=2.0.0+M5&target_milestone=2.0.0M1&target_milestone=2.0.0M4&target_milestone=2.0.0M5&target_milestone=2.0.0M6&target_milestone=2.0.0M7&target_milestone=2.0.0RC1&target_milestone=2.0.0RC2&target_milestone=3.0&target_milestone=3.0+M7&target_milestone=3.0+RC1&target_milestone=3.0+RC2&target_milestone=3.0+RC3&target_milestone=3.0+RC4&target_milestone=3.0.0&target_milestone=2.0+RC0&target_milestone=2.0+RC1&target_milestone=3.0&target_milestone=3.0+M7&target_milestone=3.0+RC1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= Remaining Targeted Bugs] (~6) | ||
Line 112: | Line 123: | ||
*Minutes: | *Minutes: | ||
− | : | + | : Only 6 bugs left targeted to 3.0 to clean up |
− | + | : 40 unverified resolvered blockers/criticals to close | |
− | : | + | |
− | + | ||
== WTP 3.0.1 == | == WTP 3.0.1 == | ||
Line 134: | Line 143: | ||
*Test | *Test | ||
− | === Bug Lists | + | === Bug Lists for 3.0.1 === |
:[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0.1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= 3.0.1 Blockers & Criticals] | :[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0.1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= 3.0.1 Blockers & Criticals] | ||
Line 142: | Line 151: | ||
*Minutes: | *Minutes: | ||
+ | :First M build to be declared on 7/11 | ||
+ | :Smoketest will be issued on 7/10 | ||
== Performance Focus (Kaloyan) == | == Performance Focus (Kaloyan) == | ||
Line 147: | Line 158: | ||
No progress for the last two weeks. Still fighting with the Results Graph Generator. | No progress for the last two weeks. Still fighting with the Results Graph Generator. | ||
*Minutes | *Minutes | ||
− | :Kaloyan: | + | :Kaloyan: still stuck, no updates so far |
== API Tools/Scans (Kaloyan) == | == API Tools/Scans (Kaloyan) == | ||
Can we run reports? Though they are hard to spot errors since out of date ... perhaps we can "diff" reports? | Can we run reports? Though they are hard to spot errors since out of date ... perhaps we can "diff" reports? | ||
+ | |||
+ | *Minutes: | ||
+ | :DaveC: will look into diff reports | ||
+ | :Kaloyan: will run reports on our released build next week | ||
== Other business == | == Other business == |
Latest revision as of 19:46, 26 June 2008
Contents
WTP Development Status Meeting 2008-06-26
Attendees
|
|
|
Announcements And Reports
WTP 3.0 released! Congratulations & Thanks everyone!
Marking bugs for official patch
No meeting next week 07/03/2008
Focus on Requirements Planning (Raghu)
- Minutes:
- Raghu: main wiki page for the next release => next Thursday
- July 21st: 1st round of enhancement, add a 'Plan' keyword in bugzilla
- Project plan in a standard format
- Final cut for plan document August 22nd
- Instructions will be posted on the wiki page
WTP 2.0.3
Schedule
- June 27 - M build
- July 3rd - RC1 build
- July 10th - RC2 - Final build
- July 11th - 2.0.3 GA
- Build
- Smoketest
- Minutes:
- Proposed schedule is official
- smoketest will be issued tomorrow morning and driver to declare later in the day
WTP 3.0
- We are DONE!!! Thank you!
- 3.0 release page
Bug Lists
- 3.0 JST, WST, JSF Bugs Fixed (~1101)
- 3.0 JPT Dali Bugs Fixed (~229)
- Note: a 3.0.1 target was added to bugzilla (not M301 301), to better re-target some of the bugs.
- Resolved but Unverified Blockers/Criticals By Assignee (~40)
- Minutes:
- Only 6 bugs left targeted to 3.0 to clean up
- 40 unverified resolvered blockers/criticals to close
WTP 3.0.1
Schedule
- Guideline
- In general, the minimum requirement is that if you branch a plug-in, you need to branch all the plug-ins in the corresponding map file. This is to make it easier for others to know what to load, to "be current" in a maintenance branch. It is fine to branch everything in a sub-project if you choose to, but still need to correspond to what's in a map file, and the map file should be updated to explain what it's used for. Map files can be re-organized some, if that helps make it easier to organize and understand what teams are working on what.
- The names for branches should follow the pattern of 'R3_0_maintenance'. This will be the name for all 3.0.x maintenance work (not just the first, 3.0.1 maintenance work). Note that JSF and JPA code may use R2_0_maintenance, but their map files, will still be branched using R3_0_maintenance.
- Build
- Test
Bug Lists for 3.0.1
- All 3.0.1 Hotbugs (~1)
- Minutes:
- First M build to be declared on 7/11
- Smoketest will be issued on 7/10
Performance Focus (Kaloyan)
No progress for the last two weeks. Still fighting with the Results Graph Generator.
- Minutes
- Kaloyan: still stuck, no updates so far
API Tools/Scans (Kaloyan)
Can we run reports? Though they are hard to spot errors since out of date ... perhaps we can "diff" reports?
- Minutes:
- DaveC: will look into diff reports
- Kaloyan: will run reports on our released build next week
Other business
- BobF: meta-data: happy to round up the webpage?
- David: some projects do not point to a pheonix style page
- Action: by July: sub-project to get rid of or update pages to be consistent with pheonix style page
Teams Status and Focus for Coming Week
Source Editing
- Ongoing triaging of incoming bug reports
- Working on updating bug backlogs
- Triaging remaining 3.0 requirements and targeted bugs
Server Tools
Web Services/WSDL
- Ongoing triage of incoming and existing bugs.
- Fixing and verifying bugs.
Java EE
Dali JPT
- JPT 2.0
- Working on:
- EclipseLink support
- Bugs for M7
- Performance
- Working on:
JSF
- Feature exceptions
- Bug Fixes
releng
- tweaks to downloads page, 202 patch builds, prepare 301 maintenance builds, better integrate Incubation Builds, integrate production of update site via cruise control tasks.
References
- In general, the minimum requirement is that if you branch a plug-in, you need to branch all the plug-ins in the corresponding map file. This is to make it easier for others to know what to load, to "be current" in a maintenance branch. It is fine to branch everything in a sub-project if you choose to, but still need to correspond to what's in a map file, and the map file should be updated to explain what it's used for. Map files can be re-organized some, if that helps make it easier to organize and understand what teams are working on what.
- The names for branches should follow the pattern of 'R3_0_maintenance'. This will be the name for all 3.0.x maintenance work (not just the first, 3.0.1 maintenance work). Note that JSF and JPA code may use R2_0_maintenance, but their map files, will still be branched using R3_0_maintenance.
- Instructions for tagging existing and new WTP wiki pages can be found at WTP's Category page; remember, we can create subcategories as well
- This Week's Smoke Test Results
- Build Declaration Process Refined - See WTP Build Process and Procedures
- Reminder:
- Information about process for milestone bugzilla line item planning has been added to the WTP Bugs, Workflow, and Conventions document.
- PMC Candidate Review Request Checklist - See the updated PMC Review document with attention to the "How To Prepare a PMC Defect Candidate" section
- Adopter Migration Information for WTP 2.0 - Please add any details for your component.
- Website
- Documentation on Setting up your system for Web Tools Web site development and Using Web Tools Phoenix PHP templates is on the wiki at Web Tools Web Site Development.
- Bug Day
- Monitor and participate in Bug Day if you would like.
- Mark any applicable bugs with keyword "bugday", but only if you'll have a representative on hand to respond through Bugzilla or in IRC
- Current WTP Bug Day bugs (~53)
Release Review Requirements References
IP Log
- In general, Project leads should review our IP Log for completeness and correctness.
- non-Committer Contributions
- * bugzillas with contributed patches should be marked with contributed keyword
- * There are some WTP IP Tools to help explore potential contributions.
Copyrights
- Make sure copyrights are up-to-date and according to Eclipse Foundation form:
Check for "license files"
- Check 'about.html' files exists
- are valid
- have correct "layout" in directories
- References:
- In the general eclipse legal section
- http://www.eclipse.org/legal/
- In the general eclipse legal section
- Is one page that speaks to the about files directly
- http://www.eclipse.org/legal/epl/about.php
- In particular, note there are two that refer to literal HTML only versions, to use as your starting point.
- http://www.eclipse.org/legal/epl/about.html
- http://www.eclipse.org/legal/epl/longabout.html
- In particular, note there are two that refer to literal HTML only versions, to use as your starting point.
- Also, please read
- http://www.eclipse.org/legal/guidetolegaldoc.php#Abouts
- It goes into detail about the locations, needs for plugins and features, and also mentions that third party content requires a seperate license file.
- Also, please read
Bug Backlogs
- All Untriaged WTP Bugs (Graph)
- All Untriaged WTP Bugs (~244)
- All WTP Verified, Not Closed Bugs (Graph)
- All WTP Verified, Not Closed Bugs (~398)
- All WTP Resolved, Unverified Bugs (Graph)
- All WTP Resolved, Unverified Bugs (~2098)
- All WTP Defect Backlog (Graph)
- All WTP Defect Backlog (~3131)
- All WTP Future Bugs (~422)
- All Open WTP Bugs with Patches Attached (Graph)
- All Open WTP Bugs with Patches Attached (~205)
- All API Requests (~9)
Focus on Backlog and Quality metrics (Neil)
Current Focus Item
- Untargeted bugs with patches attached opened before January 1st, 2008 (Last week - 24; Currently ~ 23)
- Options are
- Target bug for a release or "future"
- Mark as Invalid or Wont Fix
Upcoming Focus Item
Past Focus Items
- Untargeted Enhancements opened before January 1st, 2007 (Last week - 62; Currently ~ 58)
- Before July 1st, 2007 - 109
- Options are
- Invalid - Enhancement does not fit with the scope of the project or is already implemented.
- helpwanted keyword - This is a valid request, but due to committer resources and other priorities, outside help will be needed to make this happen.
- Future - I would use this in conjunction with the helpwanted keyword. I use this for legitimate requests that are important but will not make any planned release, but likely will make a future release.
- Untargeted severity "Major" and higher bugs opened before January 1st, 2007 (Last week - 2; Currently ~ 0)
- Before July 1st, 2007 - 21
- Minutes:
- Neil: will focus on untargeted enhancements again after Release of 3.0