Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Hudson-ci/Planning/Cross Job Summary"
m (New page: {{Hudson|pageTitle=Cross Job Summary Views}} = Requirement = This feature describes a need to visualize a summary or dashboard which gives an overview results / progress of a whole ser...) |
m |
||
Line 3: | Line 3: | ||
= Requirement = | = Requirement = | ||
− | This feature describes a need to visualize a summary or dashboard which gives an overview results / progress of a whole series of related but separate jobs | + | This feature describes a need to visualize a summary or dashboard which gives an overview results / progress of a whole series of related but separate jobs. The main problem here being that currently a developer has to |
+ | |||
+ | #Know that a set oif jobs are in some way related | ||
+ | #Drill down into each job to acertain the true status of each |
Latest revision as of 18:16, 4 October 2011
Hudson Continuous Integration Server | |
Website | |
Download | |
Community | |
Mailing List • Forums • IRC • mattermost | |
Issues | |
Open • Help Wanted • Bug Day | |
Contribute | |
Browse Source |
Cross Job Summary Views |
---|
Requirement
This feature describes a need to visualize a summary or dashboard which gives an overview results / progress of a whole series of related but separate jobs. The main problem here being that currently a developer has to
- Know that a set oif jobs are in some way related
- Drill down into each job to acertain the true status of each