Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Equinox Minutes - 20080909"

(New page: == Galileo Planning == * Equinox plan needs to be created in standard form * Equinox components should have a draft of their component plan ready for next week * Aim to finalize Equinox p...)
(No difference)

Revision as of 14:13, 9 September 2008

Galileo Planning

  • Equinox plan needs to be created in standard form
  • Equinox components should have a draft of their component plan ready for next week
  • Aim to finalize Equinox plan by end of September

Back to the top