Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Equinox p2 Meeting 20080616"

(New page: == Attendees == * DJ * McQ * Jed * John * Simon * Susan * Pascal == Minutes == * Slow connection with proxies * NPE loading bad zips * Problems when the mock IUs resolve, but the real ...)
 
(Minutes)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
 
== Attendees ==
 
== Attendees ==
  
Line 12: Line 11:
 
== Minutes ==
 
== Minutes ==
  
* Slow connection with proxies
+
* Some people are still reporting slow connections when connecting via proxies. We need to track down what is going on here and whether it is a JVM problem, ECF problem, or something else [http://bugs.eclipse.org/121201 bug 121201].
* NPE loading bad zips
+
* Trying to track down problems when loading invalid zip files. If you have a reproducible case please comment in [http://bugs.eclipse.org/234579 bug 234579]
 
* Problems when the mock IUs resolve, but the real IUs do not, so subsequent installs/updates  
 
* Problems when the mock IUs resolve, but the real IUs do not, so subsequent installs/updates  
 
* 3.5 planning
 
* 3.5 planning

Latest revision as of 11:36, 16 June 2008

Attendees

  • DJ
  • McQ
  • Jed
  • John
  • Simon
  • Susan
  • Pascal

Minutes

  • Some people are still reporting slow connections when connecting via proxies. We need to track down what is going on here and whether it is a JVM problem, ECF problem, or something else bug 121201.
  • Trying to track down problems when loading invalid zip files. If you have a reproducible case please comment in bug 234579
  • Problems when the mock IUs resolve, but the real IUs do not, so subsequent installs/updates
  • 3.5 planning
    • Would like to gather list of things to work on
    • Will set up a wiki page where people can list the areas they plan to work on
  • UI working group walk through next week
  • Try to help people out with adopting p2

Back to the top