TPTP-AG-20080331
Contents
Date
- March 31, 2008
Attendees
- Present:
- Eugene Chan
- Tony Wang
- Alex Nan
- Duwayne Morris
- Oliver Cole
- Kent Siefkes
- Mikhail Loenko
- Alexander Alexeev
- Chris Elford
- Mikhail Voronin
- Joanna Kubasta
- Joel Cayne
Topic
- 4.5 Deferred Enhancements and Defects
Minutes
Platform Project
- P1 Enhancements:
- Deferring to I7:
- IPv6 support: Containable in I7.
- Improvements in build process: Plan to complete in I7.
- OpenSSL (pending legal approval): CQ was originally denied and IBM Legal is checking if we can prereq OpenSSL instead.
- Add contention analysis: Containable in I7.
- Deferring to Future:
- Dynamic Discovery: Requested by IBM consuming product. Converted from a defect to an enhancement too late in the release.
- Standalone data collection: Not containable due to lack of resources.
- Recursively accumulated sizes in memory profiling: Not containable due to lack of resources.
- Predefined profiling filters: Not containable due to lack of resources.
- Order of filter execution: Not containable due to lack of resources.
- Deferring to I7:
- P1 Defects:
- Deferring to I7:
- Reattach from WB with JVMPI profiler failed to collect data.: Blocker defect that cannot be contained in I6 due to insufficient resources. There is no work-around. Paul has opposition to deferring a blocking defect with no work-around but there are no resources to resolve the defect.
- Candidates for I6:
- Reattach from WB with JVMPI profiler failed to collect data.: Fix is ready. Requesting PMC approval.
- Exceptions when opening the Platform documentation.: Fix is ready. Requesting PMC approval.
- Changing sorting order in the log view on an rdb resource takes a long time: Fix is ready. Requesting PMC approval.
- [CGProf inconsistent data for execution profiling with full details]: Fix is ready. Requesting PMC approval.
- [PII Missing shortcut keys in TPTP profiling context menu]: Fix underway.
- Deferring to I7:
- IPv6 and Java 6 support are required by IBM in I7.
Test Project
- P1 Enhancement:
- Deferring to I7:
- Move, Copy, Delete, Rename and Import/Export test assets.: Code complete with test cases/documentation outstanding.
- Deferring to I7:
- P2 Enhancement:
- Deferring to I7:
- P1 Defects:
- Deferring to Future:
- (Vista) Windows informational dialog when generating JScrib test reports.
- (Usability) Verdict Summary BIRT chart in Test Log viewer displays 0%.
- (Usability) Hyperlinks in Test Log view are rendered differently for the Test Execution event type.
- (Test Automation) Merge the various existing/proposed TPTP test execution frameworks.
- TPTP test pass reports show test type ID instead of meaningful name.
- Document, publicize and remove deprecated classes/APIs.
- Test deployment documentation require more detailed information.
- Replace usage of deprecated APIs/extension points.
- NullPointerException when requesting publication of AGR test results from Ant script
- JUnit/Plug-in tests do not allow plugin root as source folder.
- JSrib report generators do not recognize execution results with custom names.
- Document Test perspective extension points
- Datapools are not portable.
- AGR test suites model disabled test invocations incorrectly.
- Deferring to I7:
- NullPointerException when requesting publication of AGR test results from Ant script
- (Product) Cannot remove a test invocation to a removed HTTP request.
- Adding a location or artifact with a duplicate name of a removed resource in a deployment does not work
- (Product) copy/paste of a simple folder does not work in Test Navigator view
- Filename vs. logical name in UI
- Need new icon for testlog files
- (Usability) Switch to Test Perspective after test execution.
- Fix spelling/broken links/accessibility errors in JUnit Plugin/Manual Test/BIRT Reports plug-ins.
- (Product) Test Log Viewer: Link to deployment is displayed when using temp deploy not named 'default'
- Removing an Artifact Location Pair returns a Null Pointer Exception
- (Usability) Hyperlinks in Test Log view are rendered differently for the Test Execution event type.
- (Product) (Usability) creating TPTP test but you need to have parent project created first.
- (Usability) Test Log view does not open after a test execution has completed.
- Remove XMLUnit dependency and convert reporting tests to TPTP tests.
- Execution of any testsuite fails - InactiveProcessException
- (APAR) UI allows to launch non-profilable tests in profile mode
- (Product) variables are listed twice in the "EquivalenceClass" pane of Datapool
- (Usability) .execution files should give more informative statistics
- (Usability) Verdict Summary BIRT chart in Test Log viewer displays 0%.
- (Vista) Windows informational dialog when generating JScrib test reports.
- JUnit/Plug-in tests do not allow plugin root as source folder.
- Location does not contain port number.
- Datapools are not portable.
- Document, publicize and remove deprecated classes/APIs.
- (Product) scroll bars not appearing when needed in test suite editor and other Hyades editors when content doesn't all fit in a page
- (Product) Accessibility-Need shortcuts for all Test Navigator pulldowns
- Log Viewer : navigation button on event part of test log are not enabled by default
- (Product) Unmovable rows in Datapool Editor
- (Usability) Missing/inconsistent titles/descriptions/icons in test report dialogs.
- Deprecate JScrib and JScrib report generators.
- Test.Execution.JUnitRunner.testsuite and Test.Execution.JUnitRunner.Bug186196.testsuite are failing.
- Test Tools documentation I5/I6 smoke test failures.
- Deferring to Future:
Trace Project
- P1 Enhancements:
- Deferring to I7:
- (Tech Preview) Add per thread execution time, cycles and instructions: IBM resource issue with Richard.
- Deferring to I7:
- P1 Defects:
- Deferring to I7:
- Upgrade ARM agent to the new AC execution framework: Moving from Joe to Richard and there is an IBM resource issue since Matt left IBM.
- For Java 5 and above ARM needs to use TI agent and not the PI agent: Dependant 212009
- Deferring to I7:
Monitoring Project
- P1 Defects:
- Deferring to I7:
- 201084: Resources available.
- Remove any references to WSDMTooling from the TPTP web site and bugzilla: Resources available.
- Ensure backward compatibility for the Log Analyzer components when updating via update manager: Resources available.
- Untranslated string in UI.: Resources available.
- Deferring to I7:
Questions/Answers
- Q: Can we merge I6 TP1 and TP2?
- A: We will merge I6 TP1 and TP2 (target: April 4).
- Q: What are the final translation dates?
- A: April 7 is PII freeze. Emergency drops on April 21 and during TVT (May 9 - 30).
Action Items
- Joanna, Alex A., Alex N. will prepare a list of candidate defects to be deferred to future.