Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
DSDP/TML/Agenda09Jan06
Attendees
- Ruth Soliani (Eldorado)
- Eric Cloninger (Motorola)
- Fabio Fantato (Eldorado)
- Yufen Kuo (Montavista)
- Scott Lewis (EclipseSource)
Summary
ECF/TmL Integration
- Scott was on the call and discussions of cooperation between the projects around VNC components.
- (FF) TODO: Send PSF files for TmL components to ecf-dev@eclipse.org, cross-posted to dsdp-tml-dev@eclipse.org
Release 0.2
- (FF/EC) Release Review 14-Jan
- (FF) Update Site/Download site 15-Jan
- Release Notes + News and Noteworthy
- (FF) preparing files 9-Jan
- (FF) uploading files 15-Jan
- (FF) Ramp Down Policy 0.2 15-Jan
- Planning 0.2.x releases to be synchronized with internal requirements
Yufen Kuo contribution
- Integrated into 0.2
- Wizard was included only in optional SDK package
- Examples has wizard calls commented.
- Changes during the integration making the test phase too short to guarantee including this code in 0.2
- There are a bug to fix samples to 0.2.1 and 0.3
Release 0.3M5
- (DF) bugfix 246082 28-Jan
- (DF) bugfix 247179 28-Jan
- (DF) 257288 IP
- Verifying dependencies 9-Jan
- Starting request 16-Jan
- (FF) get orbit IP approval for /proc
- Receive Approval until 30-Jan
- (FF) 257287 Ramp Down Policy
- Draft 16-Jan
- Final 30-Jan
- (TBD) 257292 Leverage OSGI OK, review pending 16-Jan
- (TBD) 257293 Execution environment OK, review pending 16-Jan
- (TBD) 257304 Usability 16-Jan
- (TBD) 257291 Version Numbering OK, review pending 16-Jan
- (TBD) 257303 Localization - ICU4J OK, review pending 16-Jan
- (TBD) TW documentation - integrate material produced by TW team - 16-Jan
- (TBD) 257114 tutorial common package
- (DF) Black Duck /proc 9-Jan
- (EC/FF) Start stamp process /proc 13-Jan
Other issues
- Site review and wiki clean up
- SVN review
- On hold to check environment
- (FF) open a bug against eclipse site to setup a test module in SVN before migration
- Build scripts
- (FF) working on Richard's feedback (received in 5-Jan) 9-Jan
- (TBD) Phase 2 - change hard-coded variables to make nightly build more dynamically and ask to webmaster setup cron table 16-Jan
- (TBD) Phase 3 - use common build model (new eclipse feature) 23-Jan
- Live.eclipse.org - M6
- (TBD) Suggestion-> upload slides and video from eclipsecon2008, need some compilation before it.
- (TBD) TM integration - 0.4
- ECF and VNC component - 259524
- Bugfix scrolling - 259526 - need evaluate and estimate
- Bugs from internal product integration
Release 0.3M6
- (FF/EC) estimate next steps and define priorities
- (TBD) 221740 Implement Linux samples and review existent samples to use the Yufen mechanism.
- (TBD) 243494 compile to Galileo
- (TBD) 243500 device proxy
- (TBD) 243504 GPS reference implementation
- (TBD) 243508 user guide
- (TBD) 243509 how to
- (TBD) 243510 cheat sheets
- (TBD) 243511 unit tests
- (TBD) 244249 canvas background
- (TBD) 255255 adding extension points in /proc
- new bug to javadoc review
Suggest to postpone
- (TBD) 243496 top
- (TBD) 243497 cpuinfo
- (TBD) 243502 Device Proxy logging/diagnostic
- (TBD) 243505 log viewer in TPTP
- (TBD) 247390 validation for properties
EclipseCon 2009
- Tutorial - 4hs
- Long Talk - 1h
- Short Talk - 10 min
- How many people? Names? How free tickets will be used?
Tutorial Format
- Introduction (5min)
- Technical Overview (25 min)
- VNC hands on (40 min)
- Device Framework hands on (1h)
- Break (10 min)
- /proc FS (30 min)
- Device Proxy (50h)
- Q&A (20 min)
- Schedule:
- V0 --> 26-Jan --> send to Eric review
- V1 --> 30-Jan --> after review (First submission to site)
- Eldorado internal dry run and adjustments - 4-Feb
- Conference call dry run - 6-Feb
- Final submission - 13-Feb
Next Meeting
The next meeting will be on January 20, 2009