COSMOS v1.1 iteration 6 plan
Schedule for Iteration 6
Design doc every enhancement
- if the enhancement is really small, put in at least a paragraph and a link to the use case for QA and documentation.
- if the enhancement is not small, the design doc needs to explain the change, anyone other than the assignee who is affected, how much work it is, any ramifications, and in general please avoid any changes to 3rd party materials other than removing a dependency on it. We have no guarantee that the change will be approved for COSMOS v1.1.
Bugzillas for this iteration (Jimmy, David, Jason, Saurabh, QA, Doc)
Sizing legend:
- Low - takes 1-3 days
- Medium - takes a week
- High - takes more than a week
Status to be filled in by:
- Data Collection bugzilla status (Jimmy Mohsin)
- Data Visualization bugzilla status (Jimmy Mohsin)
- Resource Modeling bugzilla status (David Whiteman)
- Management Enablement bugzilla status (Jason Losh)
- RE/Build bugzilla status (Saurabh Dravid)
- QA bugzilla status (No owner)
- Doc bugzilla status (No owner)
- Legal & release review prep and status (Jason Losh)
The Status column can have one of these values:
- COMPLETE
- On track
- At risk
- Not containable
- Defer (no longer a priority for this iteration)
- Not started
Priority | Status | Project or subteam | Enhancement | Severity | Description | Blocked by (if applicable) | Owner | Sizing | Design Doc | Use Case |
---|---|---|---|---|---|---|---|---|---|---|
Medium | COMPLETE | Management Enablement | 282059 | Enhancement | Need to finalize format to specify translationKeys and their order | N/A | Jason Losh | Medium | ||
Medium | COMPLETE | Management Enablement | 281219 | Enhancement | Add in code to handle localization files to CLI | 282059 | Josh Hester | Medium | 281219 | |
Medium | Defer | Management Enablement | 281282 | Enhancement | Resolve ResourcePropertyType variables | N/A | Jeff Hamm | Medium | ||
Low | Defer | RE/Build | 281276 | Bug | Remove obsolete profile project and add new profile project | N/A | Saurabh Dravid | Low | N/A | N/A |
High | Not Started | Management Enablement | 281288 | Enhancement | Decompose operation handler into discreet operations | N/A | Mark Mccraw | High | Needed | Needed |
Medium | COMPLETE | Management Enablement | 281881 | Enhancement | Create osgi bundles for implementing logging in the runtime | N/A | Jeff Hamm | High | N/A | N/A |
Medium | Defer | Management Enablement | 282024 | Enhancement | Need to honor priority attribute for AlternateTypes and ConstraintTypes | N/A | Jeff Hamm | Medium | N/A | N/A |