Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "COSMOS V1.0i12 week3 status"
(→Resource Modeling (David Whiteman)) |
(→Data Collection (Jimmy Mohsin)) |
||
Line 28: | Line 28: | ||
Hubert tested the org.eclipse.cosmos.dc.framework.test test suite, which passed 100%. | Hubert tested the org.eclipse.cosmos.dc.framework.test test suite, which passed 100%. | ||
− | One bug was found with the config program. (bug 240976) The fix has been checked in. | + | One bug was found with the config program. ([http://bugs.eclipse.org/240976 bug 240976]) The fix has been checked in. |
{|{{BMTableStyle}} | {|{{BMTableStyle}} |
Revision as of 09:57, 16 July 2008
Contents
COSMOS weekly status
QA status (Srinivas Reddy Doma)
Found few new issues/bugs on the latest weekly build:
- Data Visualization
- 241091 - Registration/Deregistration response window displays root node as "No Items Returned"
- No report generation (both statistical and Log reports)
- Queries defined under New Folder are not visible
- Not able to expand and view "staff01" and "staff02" pre-defined queries
- Data Collection
- configDemo.bat - not accepting dojo-release-1.1.0, giving error as "Invalid path to DOJO zip file"
RE/Build team status (Saurabh Dravid)
Web/Documentation (Rich Vasconi)
Testing Status of COSMOS Candidate Driver COSMOS-1.0.0-200807151230
Team, after you have updated your status on this page, send an email to Jagmit Singh (jagmits at ca.ibm.com) so that he can track when all of the status is posted and ready. To reduce noise on the mailing list, report to cosmos-dev only if you find a problem that other people need to know about and react to. Jagmit will post an email stating when the driver has passed all tests.
Data Collection (Jimmy Mohsin)
Hubert tested the org.eclipse.cosmos.dc.framework.test test suite, which passed 100%.
One bug was found with the config program. (bug 240976) The fix has been checked in.
Component | Pass rate |
---|---|
org.eclipse.cosmos.dc.cmdbf.services | 100% |
Data Visualization (Sheldon Lee-Loy)
Found 3 new bugs:
240983 - Cannot generate reports. Fix checked in.
240980 - Folder Icon should change.
240982 - Sometimes predefined queries under sub folders do not sho...
Component | Pass rate |
---|---|
org.eclipse.cosmos.examples.e2e.tests/DataVisualization.UI.Component.Widget | 90% |
org.eclipse.cosmos.examples.e2e.tests/DataVisualization.UI.Reports | 0% |
Resource Modeling (David Whiteman)
Component | Pass rate |
---|---|
org.eclipse.cosmos.rm.smlif.tests | 100% |
org.eclipse.cosmos.rm.repository.tests | 96% |
org.eclipse.cosmos.rm.validation.tests | N/A |
Management Enablement (Jason Losh)
Bugzilla status
Status to be filled in by:
- Data Collection bugzilla status (Jimmy Mohsin)
- Data Visualization bugzilla status (Sheldon Lee-Loy)
- Resource Modeling bugzilla status (David Whiteman)
- Management Enablement bugzilla status (Jason Losh)
- RE/Build bugzilla status (Saurabh Dravid)
- QA bugzilla status (Srinivas Reddy Doma)
The Status column can have one of these values:
- COMPLETE
- On track
- At risk
- Not containable
- Not started
Enter the status on the i12 plan and status