Difference between revisions of "Aperi Development Status Meeting 12/11/06"

Line 15: Line 15:
 
** Aperi 0.2 build
 
** Aperi 0.2 build
 
** 3rd party packages (http://www.eclipse.org/aperi/project-info/IP-Log.html)  
 
** 3rd party packages (http://www.eclipse.org/aperi/project-info/IP-Log.html)  
* Phase 2:
+
* Aperi Downloads
** Updated [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule] - updates made in the schedule.  
+
** Latest stats 
 +
** Experience and feedback
 +
* Project Schedule:
 +
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule]   
 
** Implementation
 
** Implementation
*** Porting initial contribution defects to Bugzilla
+
*** Porting initial contribution defects to Bugzilla:
**** Dave will sort through the defects and send each owner a note today to have them verify the validity of their defects.
+
**** Status on porting all items - target 12/8  
**** If a defect is still valid, the owners will need to move them over to Bugzilla by the end of the week, 12/8
+
*** Porting tracks from 3.x:
*** Porting tracks from 3.x
+
**** Status on estimates for moving tracks over - target 12/8
**** Khan has built a list of tracks
+
**** Ted will send out an email to component owners with the list asking them to see if the tracks apply and provide an estimate of how long they expect it will take to move them over
+
 
** IDVT  
 
** IDVT  
 
*** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
 
*** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
*** Test still on track.  The IDVT team executed 109 testcases with 95 of them successful for the week ending 12/01/06. 
+
*** Defect status
*** The test team also added the following scenarios for our PII IDVT
+
**** Critical defects
**** Performance test for both Derby & DB2 DB
+
**** Blocked testcases   
**** Fabric Zone Control
+
**** Fabric Inband Agent
+
****  Disk Alerts
+
*** which makes the total testcases now 187.
+
**** The success rate is a little behind the projection
+
*** Several defects on Linux in the area of local installation on a remote server
+
**** Cannot install on Linux at all – the install db script does not work – all Linux tests are currently blocked
+
*** Set up development environments on test machine
+
**** Hans is still having problems running that.  Khan indicated with the latest fixes, the test should be able to get running now.  Hans will verify.  
+
 
** ID
 
** ID
*** Install instructions for 0.2 review – awaiting Todd’s review
+
*** Install instructions for 0.2 review complete?
*** Chris to put the latest documents out on the wiki  
+
*** Latest documents out on the wiki?  (link)
*** Development ID work – no issues  
+
*** R2 Development ID work – issues
 +
*** Comments on documentation from team
 
* Action Items
 
* Action Items
 
{| border="1" style="background-color:#EDDDEE;"
 
{| border="1" style="background-color:#EDDDEE;"
Line 52: Line 45:
 
| Questionnaires submitted 9/6.  - Helen has created tables in the [http://www.eclipse.org/aperi/project-info/IP-Log.html IP Log] to track the individual IPZilla entries for each Third Party Contribution Questionnaire.  
 
| Questionnaires submitted 9/6.  - Helen has created tables in the [http://www.eclipse.org/aperi/project-info/IP-Log.html IP Log] to track the individual IPZilla entries for each Third Party Contribution Questionnaire.  
 
|-
 
|-
| Bug clean up
+
 
| Dave
+
| 11/28/06
+
| Figure out what to do with the remaining Aperi initial contribution bugs.  Either fix or move to Bugzilla.  Tie into discussion regarding 0.2 migration at next Architecture meeting.  Dave has started this activity ans we are tracking it in the implementation section.  Removing the action item.
+
 
|}
 
|}
 
* Other:
 
* Other:
** Eclipse Summit
 
*** Blog entry summary
 
**** Christoph has completed: http://aperi.blogspot.com/
 
 
** Eclipse Con., Santa Clara, March 5-8 2007, Remaining KEY DATES:
 
** Eclipse Con., Santa Clara, March 5-8 2007, Remaining KEY DATES:
*** December 1<sup>st</sup> - Long Talks and Panel proposals must be in.</li>
 
*** December 30<sup>th</sup> - Long Talks and Panels chosen.</li>
 
 
*** January 15<sup>th</sup> - Short Talks and Demos proposals must be in.</li>
 
*** January 15<sup>th</sup> - Short Talks and Demos proposals must be in.</li>
 
*** January 30<sup>th</sup> - Short Talks and Demos chosen.</li>
 
*** January 30<sup>th</sup> - Short Talks and Demos chosen.</li>
** Khan - Several SNIA Plugfests planned for 2007
+
** SNIA Plugfests planned for 2007
*** Khan to talk to Kevin to find out the intent of each plugfest review with Brenda.
+
*** Khan talk to Kevin (intent of each plugfest) & review with Brenda.
 +
* Open Forum

Revision as of 21:05, 6 December 2006

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Dial in numbers:

Toll Free: 866-617-3597 International: 210-795-0625 Passcode: 6121165

Agenda:

  • Project Leader Notes (Ted)
  • Release Engineer Notes (Todd)
  • Aperi Downloads
    • Latest stats
    • Experience and feedback
  • Project Schedule:
    • Latest Schedule
    • Implementation
      • Porting initial contribution defects to Bugzilla:
        • Status on porting all items - target 12/8
      • Porting tracks from 3.x:
        • Status on estimates for moving tracks over - target 12/8
    • IDVT
      • Test Status
      • Defect status
        • Critical defects
        • Blocked testcases
    • ID
      • Install instructions for 0.2 review complete?
      • Latest documents out on the wiki? (link)
      • R2 Development ID work – issues
      • Comments on documentation from team
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Helen 11/30/06 Questionnaires submitted 9/6. - Helen has created tables in the IP Log to track the individual IPZilla entries for each Third Party Contribution Questionnaire.
  • Other:
    • Eclipse Con., Santa Clara, March 5-8 2007, Remaining KEY DATES:
      • January 15th - Short Talks and Demos proposals must be in.</li>
      • January 30th - Short Talks and Demos chosen.</li>
    • SNIA Plugfests planned for 2007
      • Khan talk to Kevin (intent of each plugfest) & review with Brenda.
  • Open Forum