Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Aperi Development Status Meeting 10/12/06"

 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
== Dial in numbers: ==
 
Toll Free: '''866-617-3597''' 
 
International: '''210-795-0625''' 
 
Passcode: '''6121165'''
 
  
 +
== Attendees: ==
 +
Brocade (John Crandall), IBM (Craig Laverone, Todd Singleton, Brian Delaire, Ophelia Yip, Dave Wolfe, Brenda Haynes, Ted Slupesky, Chris King, Yolanda Martinez, Tom Guinane)
  
== Agenda: ==
+
== Minutes: ==
 
+
 
* Project Leader Notes (Ted)
 
* Project Leader Notes (Ted)
 +
** New date and time for this meeting
 +
*** After several options were discussed, it was agreed upon that Monday mornings at 9:00am Pacific works best for those on the call.
 +
*** Tom will post a notice to this affect on the aperi-dev mailing list and will follow up with a direct note to all of the committers to see if this time works for them as well.
 +
*** If OK with the majority of the team, the next Aperi Development meeting would be held October 23rd. 
 +
*** John mentioned that he is not getting any aperi-dev notices. Tom will ask others if they are experiencing this same phenomenon as well (in the note on the meeting change).     
 +
** IBM contribution to Eclipse Legal Review status
 +
*** No change.  The Eclipse team is in Esslingen Germany at the Eclipse Summit and not available this week.
 +
** Khan at plugfest in Boulder:
 +
*** The logistics issues have been resolved. 
 +
*** The Aperi scripted demo will be appearing as part of the Interop Demo at SNW in Orlando at the end of this month.
 
* Release Lead Notes (Dave)
 
* Release Lead Notes (Dave)
 +
**  Nothing this week
 
* Status on initial contribution items:
 
* Status on initial contribution items:
{| border="1" style="background-color:#ABCDEF;"
+
{| border="1" style="background-color:#EDDDEE;"
 
]-
 
]-
 
! Task !! Duration !! Start !! Finish  
 
! Task !! Duration !! Start !! Finish  
Line 26: Line 34:
 
| Build instructions - Eclipse cvs || 5 days || Mon 10/23/06 || Fri 10/27/06  
 
| Build instructions - Eclipse cvs || 5 days || Mon 10/23/06 || Fri 10/27/06  
 
|}
 
|}
* Updated [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule]   
+
* Updated [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule] - updates made in the schedule.  
 
* Phase 2:
 
* Phase 2:
 
** Design
 
** Design
 
** Implementation
 
** Implementation
 
** Test
 
** Test
*** Smoke Test  
+
*** Smoke Test [http://wiki.eclipse.org/index.php/Image:Aperi_weekly_defect_report_101106.pdf Build Issues]  - Hans has added CMVC defect numbers.  During the implementation phase we will review only the critical defects that are impeding the smoke tests.  Need to discuss with Hans.
 
** ID
 
** ID
 
** Derby issues
 
** Derby issues
 
* Action Items
 
* Action Items
{| border="1" style="background-color:#ABCDEF;"
+
{| border="1" style="background-color:#EDDDEE;"
 
]-
 
]-
 
! Item !! Owner !! Target !! Status
 
! Item !! Owner !! Target !! Status
Line 47: Line 55:
 
| Hans
 
| Hans
 
| 10/12/06
 
| 10/12/06
| Aggregate all performance issues in one wiki page.  Hans was unaware he had this item .  He will now address.
+
| Hans to aggregate all the performance issues into one wiki page.   
 
|-
 
|-
| NEW: Bug clean up
+
| Bug clean up
 
| Dave
 
| Dave
| 10/13/06
+
| 10/31/06
 
| Figure out what to do with the remaining Aperi initial contribution bugs.  Either fix or move to Bugzilla.
 
| Figure out what to do with the remaining Aperi initial contribution bugs.  Either fix or move to Bugzilla.
 
|}
 
|}
 
* Other:
 
* Other:
** Eclipse Summit  
+
** Eclipse Summit
 +
** Meeting day and time change
 +
*** addressed above as first topic
 
** Meeting time conflict on 10/12, 11/9, and 12/7.
 
** Meeting time conflict on 10/12, 11/9, and 12/7.
 +
*** May become moot

Latest revision as of 14:02, 12 October 2006

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Attendees:

Brocade (John Crandall), IBM (Craig Laverone, Todd Singleton, Brian Delaire, Ophelia Yip, Dave Wolfe, Brenda Haynes, Ted Slupesky, Chris King, Yolanda Martinez, Tom Guinane)

Minutes:

  • Project Leader Notes (Ted)
    • New date and time for this meeting
      • After several options were discussed, it was agreed upon that Monday mornings at 9:00am Pacific works best for those on the call.
      • Tom will post a notice to this affect on the aperi-dev mailing list and will follow up with a direct note to all of the committers to see if this time works for them as well.
      • If OK with the majority of the team, the next Aperi Development meeting would be held October 23rd.
      • John mentioned that he is not getting any aperi-dev notices. Tom will ask others if they are experiencing this same phenomenon as well (in the note on the meeting change).
    • IBM contribution to Eclipse Legal Review status
      • No change. The Eclipse team is in Esslingen Germany at the Eclipse Summit and not available this week.
    • Khan at plugfest in Boulder:
      • The logistics issues have been resolved.
      • The Aperi scripted demo will be appearing as part of the Interop Demo at SNW in Orlando at the end of this month.
  • Release Lead Notes (Dave)
    • Nothing this week
  • Status on initial contribution items:
]-
Task Duration Start Finish
Eclipse legal Review 27 days Thu 9/7/06 Thu 10/19/06
Load code into cvs at Eclipse 1 day Fri 10/20/06 Fri 10/20/06
Contribution downloadable in Eclipse cvs 0 days Fri 10/20/06 Fri 10/20/06
Build instructions - Eclipse cvs 5 days Mon 10/23/06 Fri 10/27/06
  • Updated Schedule - updates made in the schedule.
  • Phase 2:
    • Design
    • Implementation
    • Test
      • Smoke Test Build Issues - Hans has added CMVC defect numbers. During the implementation phase we will review only the critical defects that are impeding the smoke tests. Need to discuss with Hans.
    • ID
    • Derby issues
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Helen 10/31/06 Questionnaires submitted 9/6. - Eclipse has started the review. Checking with Eclipse for status and a possible target end date.
Performance Issues Hans 10/12/06 Hans to aggregate all the performance issues into one wiki page.
Bug clean up Dave 10/31/06 Figure out what to do with the remaining Aperi initial contribution bugs. Either fix or move to Bugzilla.
  • Other:
    • Eclipse Summit
    • Meeting day and time change
      • addressed above as first topic
    • Meeting time conflict on 10/12, 11/9, and 12/7.
      • May become moot

Back to the top