Jump to: navigation, search

Aperi Development Status Meeting 10/12/06

Aperi Wiki Home Aperi Meetings Aperi Development Meetings


Brocade (John Crandall), IBM (Craig Laverone, Todd Singleton, Brian Delaire, Ophelia Yip, Dave Wolfe, Brenda Haynes, Ted Slupesky, Chris King, Yolanda Martinez, Tom Guinane)


  • Project Leader Notes (Ted)
    • New date and time for this meeting
      • After several options were discussed, it was agreed upon that Monday mornings at 9:00am Pacific works best for those on the call.
      • Tom will post a notice to this affect on the aperi-dev mailing list and will follow up with a direct note to all of the committers to see if this time works for them as well.
      • If OK with the majority of the team, the next Aperi Development meeting would be held October 23rd.
      • John mentioned that he is not getting any aperi-dev notices. Tom will ask others if they are experiencing this same phenomenon as well (in the note on the meeting change).
    • IBM contribution to Eclipse Legal Review status
      • No change. The Eclipse team is in Esslingen Germany at the Eclipse Summit and not available this week.
    • Khan at plugfest in Boulder:
      • The logistics issues have been resolved.
      • The Aperi scripted demo will be appearing as part of the Interop Demo at SNW in Orlando at the end of this month.
  • Release Lead Notes (Dave)
    • Nothing this week
  • Status on initial contribution items:
Task Duration Start Finish
Eclipse legal Review 27 days Thu 9/7/06 Thu 10/19/06
Load code into cvs at Eclipse 1 day Fri 10/20/06 Fri 10/20/06
Contribution downloadable in Eclipse cvs 0 days Fri 10/20/06 Fri 10/20/06
Build instructions - Eclipse cvs 5 days Mon 10/23/06 Fri 10/27/06
  • Updated Schedule - updates made in the schedule.
  • Phase 2:
    • Design
    • Implementation
    • Test
      • Smoke Test Build Issues - Hans has added CMVC defect numbers. During the implementation phase we will review only the critical defects that are impeding the smoke tests. Need to discuss with Hans.
    • ID
    • Derby issues
  • Action Items
Item Owner Target Status
Third Party Dependency Questionnaire Helen 10/31/06 Questionnaires submitted 9/6. - Eclipse has started the review. Checking with Eclipse for status and a possible target end date.
Performance Issues Hans 10/12/06 Hans to aggregate all the performance issues into one wiki page.
Bug clean up Dave 10/31/06 Figure out what to do with the remaining Aperi initial contribution bugs. Either fix or move to Bugzilla.
  • Other:
    • Eclipse Summit
    • Meeting day and time change
      • addressed above as first topic
    • Meeting time conflict on 10/12, 11/9, and 12/7.
      • May become moot