Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Aperi Development Status Meeting 02/18/08"

(New page: [http://wiki.eclipse.org/index.php/Aperi_Storage_Management_Project Aperi Wiki Home] [http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings] [http://wiki.eclipse.org/index.php/Ap...)
 
(Agenda:)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
== Dial in numbers: ==
 
<big>
 
Toll Free: <FONT COLOR="red">'''877-421-0029'''</FONT>   
 
International: <FONT COLOR="red">'''770-615-1246'''</FONT>
 
Passcode: <FONT COLOR="red"> '''003399''' </FONT>
 
</big>
 
<!-- COMMENT
 
 
== Attendees: ==
 
== Attendees: ==
'''Brocade''' (John Crandall), '''IBM''' (Al Heitman, Dave Wolfe, Chris King, Hans Lin, Martine Wedlake, Ramani Routray, Tom Guinane), '''LSI''' (Jenny Monesson)
+
'''IBM''' (Al Heitman, Dave Wolfe, Hans Lin, Martine Wedlake, Todd Singleton, Tom Guinane)
  
 
== Minutes: ==
 
== Minutes: ==
COMMENT -->
 
== Agenda: ==
 
 
 
* '''Project Leader Notes:'''  
 
* '''Project Leader Notes:'''  
 +
**Tom is leaving the Aperi project for another project in IBM.  This new assignment is full time and Tom will not be able to lead the Aperi Project.  The Aperi project will need a new project lead to take over from Tom.  Eclipse project manager is a voted position.  Tom discussed with Bjorn a proposal to recommend Al Heitman for Aperi PM.  Al has worked in IBM Storage SW/HW for 20 years and was one of the lead developers for original Aperi contribution.  Al has been in Project Management for the last 1.5 years and has experience with the IBM product development process including the IBM internal open source approval process.  This experience will help Al to do the Eclipse Open Source IP work as well which is part of the Aperi PM responsibilities.  Dave and Todd indicated support for Al.  Tom will put Al’s name forward to the committer team to vote on as the Aperi project lead.  Tom thanked everyone for the last few years for the great work on the Aperi project.
 +
** No progress on action Items
 
** 2008 planning (R0.5)
 
** 2008 planning (R0.5)
 +
*** Should have updated roadmap out shortly for vote – working on schedule
 +
** Eclipse Webinar
 +
*** no updates this week
 +
*** As a sample, one of the recent webinars is [http://live.eclipse.org/node/406 here]
 
** Aperi Committers:
 
** Aperi Committers:
 +
*** Currently 2 votes outstanding.
 
      
 
      
 
* '''Release Engineer Notes (Todd):'''
 
* '''Release Engineer Notes (Todd):'''
** Build status/process
+
** Build status
 +
** Build process
 +
*** Jerry still getting access to CVS.  Tom has been working with Eclipse folks to complete Jerry’s access.  Todd is working on the extract process for build and working on building the native code.  Things are going well.   
  
 
* '''Aperi Downloads:'''
 
* '''Aperi Downloads:'''
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats]
+
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats] – no changes.
 
** [http://live.eclipse.org/node/343 Aperi webinar]   
 
** [http://live.eclipse.org/node/343 Aperi webinar]   
 
   
 
   
 
* '''Development items/issues:'''
 
* '''Development items/issues:'''
 +
** no updates this week
  
 
* '''IDVT:'''  
 
* '''IDVT:'''  
 +
** Tom ran Han’s bug report and there are no new bugs this week.
 
** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
 
** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
 
*** Aperi Total Open 'Non-Enhancement' Defects - [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Aperi&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= by priority & severity]  
 
*** Aperi Total Open 'Non-Enhancement' Defects - [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Aperi&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= by priority & severity]  
 
*** Aperi Total Open 'Enhancement' Defects - [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Aperi&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= by priority & severity]
 
*** Aperi Total Open 'Enhancement' Defects - [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Aperi&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= by priority & severity]
 
   
 
   
* '''ID:'''  
+
* '''ID:''' – no updates 
  
 
* '''Project Schedule:'''  
 
* '''Project Schedule:'''  
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule].
+
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule]. – No updates on project schedule for this week.  We’ll be working 1 on 1 with folks to build schedule in the next week.  Look for meeting invites.
  
 
* '''Action Items:'''
 
* '''Action Items:'''
Line 53: Line 54:
 
| 01/29/08
 
| 01/29/08
 
| Write up text for Aperi document control.   
 
| Write up text for Aperi document control.   
 +
|-
 +
| Post the new tutorials out on Eclipse Live.
 +
| Tom
 +
| 02/29/08
 +
| need status
 +
|-
 +
| Tom to talk to Mike Walker to get the OK to take snapshot at plugfest.  Can we post the snapshot to Aperi or possibly to the SNIA site?
 +
| Tom
 +
| 02/29/08
 +
| need status
 
|}
 
|}
 
* '''Other:'''
 
* '''Other:'''
Line 61: Line 72:
 
**** SAN Simulator - [http://www.eclipsecon.org/2008/?page=sub/&id=437 Session #437] (Ramani) on Tuesday March 18th, 2008 4:10pm.  
 
**** SAN Simulator - [http://www.eclipsecon.org/2008/?page=sub/&id=437 Session #437] (Ramani) on Tuesday March 18th, 2008 4:10pm.  
 
**** Aperi: Open Storage Management - [http://www.eclipsecon.org/2008/?page=sub/&id=479 Session #479] (Tom) on Wednesday March 19th, 2008 1:40pm.  
 
**** Aperi: Open Storage Management - [http://www.eclipsecon.org/2008/?page=sub/&id=479 Session #479] (Tom) on Wednesday March 19th, 2008 1:40pm.  
 +
**** Todd will take short session and poster at EclipseCon.  Ramani submitted his presentation.  Tom submitted Todds presentation last week
 
*** Aperi poster submission:  [https://eclipsecon.greenmeetingsystems.com/submissions/view/513 Session #513]
 
*** Aperi poster submission:  [https://eclipsecon.greenmeetingsystems.com/submissions/view/513 Session #513]
 +
**** We have an 8’ wide by 4’ tall poster for this.  Ramani sent power-point presentation material which the team can update.  Ramani can print out the powerpoint presentation on large paper 4’x8’ which happens to be the size of our EclipseCon poster.
 
* '''Open Forum:'''
 
* '''Open Forum:'''
 +
** Martine working on a proof of concept demo to hook up COSMOS with Aperi.  Details at eleven. – no update this week.

Latest revision as of 10:35, 19 February 2008

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Attendees:

IBM (Al Heitman, Dave Wolfe, Hans Lin, Martine Wedlake, Todd Singleton, Tom Guinane)

Minutes:

  • Project Leader Notes:
    • Tom is leaving the Aperi project for another project in IBM. This new assignment is full time and Tom will not be able to lead the Aperi Project. The Aperi project will need a new project lead to take over from Tom. Eclipse project manager is a voted position. Tom discussed with Bjorn a proposal to recommend Al Heitman for Aperi PM. Al has worked in IBM Storage SW/HW for 20 years and was one of the lead developers for original Aperi contribution. Al has been in Project Management for the last 1.5 years and has experience with the IBM product development process including the IBM internal open source approval process. This experience will help Al to do the Eclipse Open Source IP work as well which is part of the Aperi PM responsibilities. Dave and Todd indicated support for Al. Tom will put Al’s name forward to the committer team to vote on as the Aperi project lead. Tom thanked everyone for the last few years for the great work on the Aperi project.
    • No progress on action Items
    • 2008 planning (R0.5)
      • Should have updated roadmap out shortly for vote – working on schedule
    • Eclipse Webinar
      • no updates this week
      • As a sample, one of the recent webinars is here
    • Aperi Committers:
      • Currently 2 votes outstanding.
  • Release Engineer Notes (Todd):
    • Build status
    • Build process
      • Jerry still getting access to CVS. Tom has been working with Eclipse folks to complete Jerry’s access. Todd is working on the extract process for build and working on building the native code. Things are going well.
  • Development items/issues:
    • no updates this week
  • ID: – no updates
  • Project Schedule:
    • Latest Schedule. – No updates on project schedule for this week. We’ll be working 1 on 1 with folks to build schedule in the next week. Look for meeting invites.
  • Action Items:
Item Owner Target Status
Obtain two mentors Tom 03/31/08 Per new development process rules, we need to obtain two project mentors. Harm Sluiman is one. ‘’’Tom to talk to potential candidates at EclipseCon in March.’’’
Document Control Tom 01/29/08 Write up text for Aperi document control.
Post the new tutorials out on Eclipse Live. Tom 02/29/08 need status
Tom to talk to Mike Walker to get the OK to take snapshot at plugfest. Can we post the snapshot to Aperi or possibly to the SNIA site? Tom 02/29/08 need status
  • Other:
    • Next Meeting 02/25/08
    • EclipseCon 2008
      • EclipseCon 2008, March 17-20 in Santa Clara, CA. Program
      • Accepted Aperi talks:
        • SAN Simulator - Session #437 (Ramani) on Tuesday March 18th, 2008 4:10pm.
        • Aperi: Open Storage Management - Session #479 (Tom) on Wednesday March 19th, 2008 1:40pm.
        • Todd will take short session and poster at EclipseCon. Ramani submitted his presentation. Tom submitted Todds presentation last week
      • Aperi poster submission: Session #513
        • We have an 8’ wide by 4’ tall poster for this. Ramani sent power-point presentation material which the team can update. Ramani can print out the powerpoint presentation on large paper 4’x8’ which happens to be the size of our EclipseCon poster.
  • Open Forum:
    • Martine working on a proof of concept demo to hook up COSMOS with Aperi. Details at eleven. – no update this week.

Back to the top