Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Equinox p2 Meeting 20080225"

Line 8: Line 8:
 
** Moving code
 
** Moving code
 
** Changing bug bucket
 
** Changing bug bucket
 +
** Do we switch ECF now, or do we wait for the EFC I builds?

Revision as of 23:33, 24 February 2008

  • Discussion topics
    • Do we want to ship the apache http client in p2?
    • What is left before integration:
      • Renaming bundles.txt?
      • Changing namespaces in MD
      • Adding version to metadata
      • Shape of the features
    • Moving code
    • Changing bug bucket
    • Do we switch ECF now, or do we wait for the EFC I builds?

Back to the top