Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TPTP-AG-20080512"

(Defects to be resolved during I8 TP1/TP2)
(Defects to be resolved during I8 TP1/TP2)
Line 60: Line 60:
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=231858 rename does not call create update change on client proxies?]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=231858 rename does not call create update change on client proxies?]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=231786 exception raised when moving an element without selecting a destination]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=231786 exception raised when moving an element without selecting a destination]
 +
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=231870 User can create test suite in non-Java project when generating test from existing recmodel (right-clicking on it)]
 +
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=231901 New recording wizard does not enable the Finish button.]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=214388 Clean-up the TPTP committer lists and project matrix.]<sup>1</sup>
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=214388 Clean-up the TPTP committer lists and project matrix.]<sup>1</sup>
  

Revision as of 14:49, 13 May 2008

Date

  • May 12, 2008

Attendees

  • Present:
    • Paul Slauenwhite
    • Tony Wang
    • Oliver Cole
    • Alex Nan
    • Alexander Alexeev
    • Eugene Chan
    • Duwayne Morris
    • Chris Elford
    • Joanna Kubasta

Topics

  • 4.5 Deferred Enhancements and Defects.
  • Post-4.5 Discussion.

Minutes

Integrating TPTP and SAP Heap Profilers (Part 2)

  • Due to limited resources, no planned enhancements (without resources) and only defect fixing for post-4.5.
  • SAP should submit the requested enhancements.
    • We cannot commit to any enhancement work until new resources are contributed to the project.
    • The enhancement owner will assign a sizing to be used in discussing the required resources for the initiative.
  • Oliver to send an email to SAP informing them of our decisions on integrating the TPTP and SAP heap profilers.

4.5 Deferred Enhancements and Defects

Test Project

Defects to be resolved during I8 TP1/TP2

1 Covered under the Platform Project.

Defects to be deferred to Future

Monitoring Project

Trace Project

Platform Project

Post-4.5 Discussion

  • Due to limited resources, no planned enhancements (without resources) and only defect fixing for post-4.5.
  • Interest in slimming/flattening the organization of the project.
    • One person would do the scheduling.
    • One person would do mentoring/policing.
    • Project Leads would not handle resource allocation and scheduling.
  • Alex will not be contributing to the project post-4.5.
  • We need to close the post-4.5 resources over the next two weeks.
    • Joanna will discuss with IBM in preparaton for the May 21 PMC call.

Action Items

  • Oliver to send an email to SAP informing them of our decisions on integrating the TPTP and SAP heap profilers.
  • Project Leads will update this WIKI page with the complete list of 4.5 deferred enhancements and defects.
  • Project Leads will review the updated list of 4.5 deferred enhancements and defects and discuss any concerns on Wednesday's PMC call.
  • Joanna will discuss post-4.5 resources with IBM in preparaton for the May 21 PMC call.
  • Committers can send topic suggestions for upcoming AG calls to the PMC mailing list.

Back to the top