                  Attendees
- Ruth Soliani (Eldorado)
 - Eric Cloninger (Motorola)
 - Fabio Fantato (Eldorado)
 - Yufen Kuo (Montavista)
 - Scott Lewis (EclipseSource)
 
Summary
ECF/TmL Integration
- Scott was on the call and discussions of cooperation between the projects around VNC components.
 - (FF) TODO: Send PSF files for TmL components to ecf-dev@eclipse.org, cross-posted to dsdp-tml-dev@eclipse.org
 
Release 0.2
- (FF/EC) Release Review 14-Jan
 - (FF) Update Site/Download site 15-Jan
 -  Release Notes + News and Noteworthy
- (FF) preparing files 9-Jan
 - (FF) uploading files 15-Jan
 
 - (FF) Ramp Down Policy 0.2 15-Jan
 - Planning 0.2.x releases to be synchronized with internal requirements
 
Yufen Kuo contribution
- Integrated into 0.2
 - Wizard was included only in optional SDK package
 - Examples has wizard calls commented.
 - Changes during the integration making the test phase too short to guarantee including this code in 0.2
 - There are a bug to fix samples to 0.2.1 and 0.3
 
Release 0.3M5
- (DF) bugfix 246082 28-Jan
 - (DF) bugfix 247179 28-Jan
 -  (DF) 257288 IP 
- Verifying dependencies 9-Jan
 -      Starting request 16-Jan
- (FF) get orbit IP approval for /proc
 
 - Receive Approval until 30-Jan
 
 -  (FF) 257287 Ramp Down Policy 
- Draft 16-Jan
 - Final 30-Jan
 
 - (TBD) 257292 Leverage OSGI OK, review pending 16-Jan
 - (TBD) 257293 Execution environment OK, review pending 16-Jan
 - (TBD) 257304 Usability 16-Jan
 - (TBD) 257291 Version Numbering OK, review pending 16-Jan
 - (TBD) 257303 Localization - ICU4J OK, review pending 16-Jan
 -  (TBD) TW documentation - integrate material produced by TW team - 16-Jan
- (TBD) 257114 tutorial common package
 
 - (DF) Black Duck /proc 9-Jan
 - (EC/FF) Start stamp process /proc 13-Jan
 
Other issues
- Site review and wiki clean up
 -  SVN review
- On hold to check environment
 - (FF) open a bug against eclipse site to setup a test module in SVN before migration
 
 -  Build scripts
- (FF) working on Richard's feedback (received in 5-Jan) 9-Jan
 - (TBD) Phase 2 - change hard-coded variables to make nightly build more dynamically and ask to webmaster setup cron table 16-Jan
 - (TBD) Phase 3 - use common build model (new eclipse feature) 23-Jan
 
 -  Live.eclipse.org - M6
- (TBD) Suggestion-> upload slides and video from eclipsecon2008, need some compilation before it.
 
 - (TBD) TM integration - 0.4
 - ECF and VNC component - 259524
 - Bugfix scrolling - 259526 - need evaluate and estimate
 - Bugs from internal product integration
 
Release 0.3M6
- (FF/EC) estimate next steps and define priorities
 - (TBD) 221740 Implement Linux samples and review existent samples to use the Yufen mechanism.
 - (TBD) 243494 compile to Galileo
 - (TBD) 243500 device proxy
 - (TBD) 243504 GPS reference implementation
 - (TBD) 243508 user guide
 - (TBD) 243509 how to
 - (TBD) 243510 cheat sheets
 - (TBD) 243511 unit tests
 - (TBD) 244249 canvas background
 - (TBD) 255255 adding extension points in /proc
 - new bug to javadoc review
 
Suggest to postpone
- (TBD) 243496 top
 - (TBD) 243497 cpuinfo
 - (TBD) 243502 Device Proxy logging/diagnostic
 - (TBD) 243505 log viewer in TPTP
 - (TBD) 247390 validation for properties
 
EclipseCon 2009
- Tutorial - 4hs
 - Long Talk - 1h
 - Short Talk - 10 min
 - How many people? Names? How free tickets will be used?
 
Tutorial Format
- Introduction (5min)
 - Technical Overview (25 min)
 - VNC hands on (40 min)
 - Device Framework hands on (1h)
 - Break (10 min)
 - /proc FS (30 min)
 - Device Proxy (50h)
 - Q&A (20 min)
 -  Schedule:
- V0 --> 26-Jan --> send to Eric review
 - V1 --> 30-Jan --> after review (First submission to site)
 - Eldorado internal dry run and adjustments - 4-Feb
 - Conference call dry run - 6-Feb
 - Final submission - 13-Feb
 
 
Next Meeting
The next meeting will be on January 20, 2009