Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DTP PMC and Project Lead Meeting Minutes: May 12, 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Sheila Sholars
  • Larry Dunnell
  • Brian Payton
  • Linda Chan
  • Hung Hsi
  • John Graham

Regrets

  • Der Ping Chou

Agenda

  • Bundle activation/lazy start bug (BZ228295) - thanks to Brian Payton for delivering changes for modelbase, so modelbase and connectivity are done - leaves SQL Dev tools & Enablement
  • Has anyone looked at the SQL tooling documentation from Emily? (BZ229675)
  • Doshiro status - committer election finished for enablement (and access granted), modelbase election finished (and was successful, so just need to get his access granted), but sqldevtools failed due to a lack of votes - need to kick off the election again and need at least three people to vote for Doshiro to ensure election success
  • Hemant status - committer election for enablement finished (and access granted)
  • Milestone schedule (http://wiki.eclipse.org/DTP_Ganymede_Rampdown_Policy). Cycles getting much shorter, so we need to keep a close watch to make sure we keep things under control. RC1 and RC2 are really the last chance
  • Have basically until the end of the week (Sunday mid-day technically) before we have the 5/19 SH build to start testing against for RC1
  • We were down to only five bugs still set for Ganymede target milestone, but now that's jumped up to 15 again. We really need to get these down and dispositioned for RC1 or RC2 or future by the end of this week.

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=Ganymede&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_status=RESOLVED&emailtype1=exact&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=

  • We were down to just 2 last Monday, but we're back up to 13 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible.

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=

  • Sub-project status (from team leads)
  • Open discussion

Minutes

Action Items

Back to the top