Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DSDP/TM/Committer Phone Meeting 22-May-2007

< DSDP‎ | TM
Meeting Title: TM Committer Phone Meeting
Date & Time: Tuesday May 22, 2007 at 1500 UTC
Dial-in: International +44 (0)1452 567588
North America +1 (866) 6161738 (toll free)
UK National 08712460713
Passcode: 0587322148 #

MartinO to start conference call - please dial in using the numbers above.
Please be available for Skype Chat in parallel to the call. MartinO will start Skype chat just prior to call.
Skype fallback dial-in - only if less than 5 participants: martin.oberhuber, ddykstal (or david_dykstal), david-k-mcknight, kushal.munir, javier.montalvoorus, tedatteddotnet, michael_scharf, and uwe.stieber.

Attendees

  • IBM - Dave McKnight, Dave Dykstal, Kushal Munir, Kevin Doyle
  • Symbian - Javier Montalvo Orús
  • Wind River - Martin Oberhuber

This is an Open call, so anyone else can join (though we expect the talk to be interesting for committers only).

Notes

News & Review Action Items

Martin 100% RSE bugs (see bugzilla), releaseing M7 100%
DaveD 80% Persistence in metadata, Translations, Mnemonics 80%
DaveM 50% Bugfixes 50%
Kushal 40% BIDI Encodings 40%
Javier 30% FTP Parser Extension Point 30%
Ted 0% - 0%
Uwe 5% - 5%
Michael 10% Terminal API cleanup, plus small fixes; performance improvements 10%

Plan for the TM Future

Beginning of next week, the Europa Release Review slides are due. I'd like to have a rough idea where we are heading. It's also important to know when deciding what bugs can be deferred to later. Here is an outline as a discussion start: See also TM Future Planning

  • TM 2.0.1 with Europa (in autumn) or slightly earlier
    • Wind River might need 2.0.1 slightly before Europa SR1;
    • DaveD taking off 2 weeks in August (7th-20th) and large part (end of) September, heading to Prague
    • Work on unittests, isv docs over the summer in HEAD
    • Fork off from mainline in autumn; if we have any large things for 3.0 and want to start before 2.0.1 might do that in a branch; but having the branch this or that way is not a big deal
    • User actions: consider replacing it entirely by command framework
  • Will the next TM release (Ganymade coordinated release) be TM 2.1 or TM 3.0?
    • We'd probably need 3.0 for further UI/Non-UI, API Polish, finalizing terminal API
    • Doing 2.1 might be possible but harder than going for 3.0 right away; Finishing the UI/Non-UI refactoring is essential to complete for the next release
      • TM 3.0 probably not a problem at IBM
      • Javier comfortable with what RSE looks like at the moment
      • Better going for 3.0 since not yet happy with API
    • We could shoot for a 3.0 but strive to keep API changes small and potentially have a compatibility plugin
    • Integrate in next release - strong should:
      • WebDAV, Team Sync (minimal data transfer), Wicked Shell, JArchive (through RSE extension point)
    • Add in next release:
      • User actions (probably replace by Command framework), Launch Actions, VLM Lab Manager, IPxAct data, Connection Groups
      • DaveM: tings existing with IBM already: Remote Java Debug, Remote Jar Export (need legal review); export to multiple targets;
      • Contribute IBM "External Tools" implementation (very interesting!) - potentially consolidate into single User Actions framework
    • Potentially move to Platform + 0 level --> move CDT Launcher to CDT Project

Ramp Down Plan

  • TM 2.0 Ramp down Plan for Europa, based on Europa Simultaneous Release#Milestones and Release Candidates
    • RC1 -- Fri May 25 (5 work days) -- May 30: Release Review Slide Decks due
    • RC2 -- Tue Jun 5 (6 work days)
    • RC3 -- Thu Jun 14 (7 work days; Martin vacation 12-Jun til 21-Jun!)
    • RC4 -- Thu Jun 21 (5 work days)
    • EUROPA -- Jun 29
  • 1-committer-review recommended for RC1, required afterwards.
  • If there are any risky fixes, make them as early as possible, less risky fixes later
  • Reviewing assigned bugs regarding priority and potential to defer past 2.0: Individual committers, DaveD+Martin, or Martin alone?
    • Have a review phase on Friday; Kushal reviewing his; fields to change are "Priority" and "Target Milestone"
    • Have each committer do a first pass on his own assigned bugs; DaveD and Martin go through the list again on Monday.
  • Avoid breaking API changes from now on (though we can still break API if absolutely necessary)

Bugs and open work to be discussed

  • Current Priorities: Fix bugs by Priority
    • Javier: Some FTP related bugs; Happy to help out with other stuff; User docs and ISV docs for Discovery? Javier fine with doing it in RC2/RC3; Martin help out with releng aspects.
    • DaveD: Translation / Menmonics stuff, 187647 Persistence in Metadata - dont see problems but needs fairly thorough testing
      • 153632 incorrect filterpool for dstore - are we really converging to a single filter pool?
    • DaveM: Refresh related bugs; single filter pool? - DaveM does want to get to it this week: coordinate with DaveD since some issues might come up in the Persistence area
    • Martin: Need to bring Releng scripts up to latest for Orbit; Review and release Telnet fixes; 172650 Capabilities; 176461 expand-to-level; 186315 EFS problematic URIs;
      • 170910 Integrate Terminalview -- OK to defer past 2.0? Add in 2.0.1?
        • Kushal: make it available as experimental download?
        • DaveM: make it in two pathes (separate subsystem first, integrate into commandview later)?
        • IBM has a very loose terminal integration: select host, "Open Terminal" opens a separate terminal view; that would give us some kind of integration. But for TM Terminal, there are no translations, no clearance etc.
        • Decision: Better invest time into 2.0 bugfixes, and adding the Terminal in an early 3.0 milestone.
      • Would like to Rename org.eclipse.rse.eclipse.filesystem to org.eclipse.rse.efs -- OK?
        • DaveD: Files in there need to be retargeted - should not be a big problem
      • API: Would like to add some "throws" clauses to ISystemRegistry and others to ensure that nobody expects it to show messages (necessary when it is to go into non-UI in the future) -- OK?
        • Kushal: Better make API change now rather than later
      • EFS: Copy(), Move(); minimal plugin activations; UI/Non-UI
    • Kushal: Single "Encoding" control on the Host (for all subsystems); will be removing encoding control on the Shells property page
  • Bugzilla: Severity Major, hi-priority

Vacation, Away

  • DaveD travelling this week, but that shouldn't affect anything
  • Monday May 28 - Pentecost Monday in Austria (Martin OOO), Memorial Day in US (public holiday, but DaveD probably working)

Action Items

  • Last Meeting Action Items
  • DaveD: Translation Testcases; Persistence Provider without IResource; Get started on ICU4J with bug 183631
  • DaveM: Refresh Bugs
  • Kushal: BIDI bugs and Encodings
  • Martin: Testing Stats; Refresh improvements; Integrating Terminal with RSE
  • Javier:
  • Michael:

Next Meeting

Back to the top