Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "XSL Release Plan"

(Schedule)
Line 12: Line 12:
  
 
<googlecalendar width="100%" title="Web Tools Platform Release Schedule">23u09qluqisen61r5r585ke1uc%40group.calendar.google.com</googlecalendar>
 
<googlecalendar width="100%" title="Web Tools Platform Release Schedule">23u09qluqisen61r5r585ke1uc%40group.calendar.google.com</googlecalendar>
 +
 +
Please only select items that you feel you can complete. If there is a feature listed in the requirements page, that doesn't have a bug please create one for it as well.  Anything that is planned to be worked on should have a bug entered to track it's progress.
 +
 +
Please Review the [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=%5Bxslt%5D&classification=WebTools&product=Web+Tools&component=incubator&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= current backlog] and add a target milestone of 0.5M6 to any items you plan to work on during the iteration.
 +
 +
==0.5M6==
 +
 +
'''Goals:''' XInclude, Docbook, and XSL Content Assistance.
 +
 +
'''Testing Week: March 31, 2008'''
 +
 +
'''0.5M6 Build Declared: April 7, 2008'''
 +
 +
 +
The current [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Web+Tools&component=incubator&target_milestone=0.5+M6&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= iteration plan].  Any bug you target as being in 0.5M6 will show up in the plan list.
  
 
==0.5M5==
 
==0.5M5==

Revision as of 19:18, 8 March 2008

The following is a tentative schedule of dates for the XSL Tooling Project. An official release date has not been set, and the best answer at this time is "when it's ready." With that said, the XSL Tool Project will be following closely the WTP Release schedule, but will not be included in the Ganymede release.

About Version Numbering

Since the XSL Tooling project is based off of initial code contributions from both the X-Assist and OrangeVolt.com Eclipse XSLT editors. It was decided that that initial version would start off at 0.5. The first M build will start with M4 to better signify what version of WST should be used.


Schedule

The first public build version is scheduled for January 21, 2008, and will be 0.5M4. To this affect the XSL Tooling project will aim to follow the build schedule of WTP.

The calendar is available in the following formats: ICal,ATOM News Feed,HTML

Please only select items that you feel you can complete. If there is a feature listed in the requirements page, that doesn't have a bug please create one for it as well. Anything that is planned to be worked on should have a bug entered to track it's progress.

Please Review the current backlog and add a target milestone of 0.5M6 to any items you plan to work on during the iteration.

0.5M6

Goals: XInclude, Docbook, and XSL Content Assistance.

Testing Week: March 31, 2008

0.5M6 Build Declared: April 7, 2008


The current iteration plan. Any bug you target as being in 0.5M6 will show up in the plan list.

0.5M5

Testing Week: February 10, 2008

0.5M5 Build Declared: February 17, 2008

Please Review the current backlog and add a target milestone of 0.5M5 to any items you plan to work on during the next month.

The current iteration plan. Any bug you target as being in 0.5M5 will show up in the plan list.

Please only select items that you feel you can complete. If there is a feature listed in the requirements page, that doesn't have a bug please create one for it as well. Anything that is planned to be worked on should have a bug entered to track it's progress.

Back to the top