Difference between revisions of "XSL Release Plan"

(0.5M5)
(Schedule)
Line 10: Line 10:
 
The calendar is available in the following formats:
 
The calendar is available in the following formats:
 
[http://www.google.com/calendar/ical/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic.ics ICal],[http://www.google.com/calendar/feeds/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic ATOM News Feed],[http://www.google.com/calendar/embed?src=23u09qluqisen61r5r585ke1uc%40group.calendar.google.com&ctz=America/New_York HTML]
 
[http://www.google.com/calendar/ical/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic.ics ICal],[http://www.google.com/calendar/feeds/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic ATOM News Feed],[http://www.google.com/calendar/embed?src=23u09qluqisen61r5r585ke1uc%40group.calendar.google.com&ctz=America/New_York HTML]
 +
 +
<googlecalendar>23u09qluqisen61r5r585ke1uc%40group.calendar.google.com</googlecalendar>
  
 
==0.5M5==
 
==0.5M5==

Revision as of 12:15, 24 January 2008

The following is a tentative schedule of dates for the XSL Tooling Project. An official release date has not been set, and the best answer at this time is "when it's ready." With that said, the XSL Tool Project will be following closely the WTP Release schedule, but will not be included in the Ganymede release.

About Version Numbering

Since the XSL Tooling project is based off of initial code contributions from both the X-Assist and OrangeVolt.com Eclipse XSLT editors. It was decided that that initial version would start off at 0.5. The first M build will start with M4 to better signify what version of WST should be used.


Schedule

The first public build version is scheduled for January 21, 2008, and will be 0.5M4. To this affect the XSL Tooling project will aim to follow the build schedule of WTP.

The calendar is available in the following formats: ICal,ATOM News Feed,HTML

0.5M5

Testing Week: February 10, 2008

0.5M5 Build Declared: February 17, 2008

Please Review the current backlog and add a target milestone of 0.5M5 to any items you plan to work on during the next month.

The current iteration plan. Any bug you target as being in 0.5M5 will show up in the plan list.

Please only select items that you feel you can complete. If there is a feature listed in the requirements page, that doesn't have a bug please create one for it as well. Anything that is planned to be worked on should have a bug entered to track it's progress.