Difference between revisions of "XSL Release Plan"

(New page: The following is a tentative schedule of dates for the XSL Tooling Project. An official release date has not been set, and the best answer at this time is "when it's ready." With that ...)
 
(Schedule)
Line 8: Line 8:
 
The first public build version is scheduled for January 21, 2008, and will be 0.5M4.  To this affect the XSL Tooling project will aim to follow the build schedule of WTP.
 
The first public build version is scheduled for January 21, 2008, and will be 0.5M4.  To this affect the XSL Tooling project will aim to follow the build schedule of WTP.
  
<iframe src="http://www.google.com/calendar/embed?src=23u09qluqisen61r5r585ke1uc%40group.calendar.google.com&ctz=America/New_York" style="border: 0" width="800" height="600" frameborder="0" scrolling="no"></iframe>
 
  
 
The calendar is available in the following formats:
 
The calendar is available in the following formats:
 
[ICal|http://www.google.com/calendar/ical/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic.ics],[XML|http://www.google.com/calendar/feeds/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic],[HTML|http://www.google.com/calendar/embed?src=23u09qluqisen61r5r585ke1uc%40group.calendar.google.com&ctz=America/New_York]
 
[ICal|http://www.google.com/calendar/ical/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic.ics],[XML|http://www.google.com/calendar/feeds/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic],[HTML|http://www.google.com/calendar/embed?src=23u09qluqisen61r5r585ke1uc%40group.calendar.google.com&ctz=America/New_York]

Revision as of 10:19, 13 January 2008

The following is a tentative schedule of dates for the XSL Tooling Project. An official release date has not been set, and the best answer at this time is "when it's ready." With that said, the XSL Tool Project will be following closely the WTP Release schedule, but will not be included in the Ganymede release.

About Version Numbering

Since the XSL Tooling project is based off of initial code contributions from both the X-Assist and OrangeVolt.com Eclipse XSLT editors. It was decided that that initial version would start off at 0.5. The first M build will start with M4 to better signify what version of WST should be used.


Schedule

The first public build version is scheduled for January 21, 2008, and will be 0.5M4. To this affect the XSL Tooling project will aim to follow the build schedule of WTP.


The calendar is available in the following formats: [ICal|http://www.google.com/calendar/ical/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic.ics],[XML|http://www.google.com/calendar/feeds/23u09qluqisen61r5r585ke1uc%40group.calendar.google.com/public/basic],[HTML|http://www.google.com/calendar/embed?src=23u09qluqisen61r5r585ke1uc%40group.calendar.google.com&ctz=America/New_York]