Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2013-07-18"

(WTP 3.5: Luna)
(WTP 3.5.1)
Line 48: Line 48:
  
 
* Aligned with Eclipse Kepler SR1 Schedule
 
* Aligned with Eclipse Kepler SR1 Schedule
* Build will start immediately after we GA Kepler
+
* Builds started - junits need attention(move to jre7 build machines)
* No declared builds until mid July.
+
* No declared builds until 7/25
  
 
* Kepler SR1 Shutdown calendar  (from [http://wiki.eclipse.org/Kepler/Simultaneous_Release_Plan Kepler release doc])
 
* Kepler SR1 Shutdown calendar  (from [http://wiki.eclipse.org/Kepler/Simultaneous_Release_Plan Kepler release doc])

Revision as of 10:02, 18 July 2013

WTP Development Status Meeting

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

Welcome back!

WTP Calendar

(Weekly Google Calendar)


For Kepler/Luna overall dates, see the Simultaneous Release Calendar


Focus on Quality (Neil)

  • Improve:
  • Triage:
  • Target to a specific release or "future" if planning to fix but not in the next release
  • Adjust severity as appropriate

WTP 3.5: Kepler

  • Congrats!
  • Download stats: ~331,280 Java EE Epp downloads so far...
  • Retrospective next week

WTP 3.6: Luna

  • Builds have started
  • 1st declare next week - 7/25

WTP 3.5.1

  • Aligned with Eclipse Kepler SR1 Schedule
  • Builds started - junits need attention(move to jre7 build machines)
  • No declared builds until 7/25
+0
Fri.
+1
Mon.
+2
Tues.
+3
Wed.
EPP
Thur.
Available
Fri.
RC1 (Warmup) 8/16 8/19 8/20 8/21 8/22 8/23
RC2 8/30 9/02 9/03 9/04 9/05 9/06
RC3 9/06 9/09 9/10 9/11 9/12 9/13
RC4 9/13 9/16 9/17 9/18 9/19 9/20
Juno SR1 ("GA") quiet: 9/20 quiet: 9/23 quiet: 9/24 quiet: 9/25 quiet: 9/26 GA: 9/27

Bug Review

Bugs targeted to 3.5
Hotbugs [1]
Blocker and Critical

Other business - Long term tracking items

References

  1. Hotbug Policy

Also, see

Kepler SR1 Simultaneous Release Schedule
Indigo release retrospective
Standard Format Plans
WTP 3.2.x maintenance release plan
how/when to branch code?
IP Logs selector
See also the WTP Meeting Archive-Reference Page.

Back to the top