Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2010-10-14"

(10/14)
 
(WTP 3.2.3)
 
(7 intermediate revisions by one other user not shown)
Line 109: Line 109:
 
::[http://www.eclipsecon.org/summiteurope2010/ ESE 2010]  
 
::[http://www.eclipsecon.org/summiteurope2010/ ESE 2010]  
 
::[http://wiki.eclipse.org/Eclipse_DemoCamps_November_2010/RTP RTP DemoCamp]
 
::[http://wiki.eclipse.org/Eclipse_DemoCamps_November_2010/RTP RTP DemoCamp]
 +
 +
* The new [http://www.eclipse.org/proposals/osgi-enterprise-tools/ OSGi Enterprise Tools proposal] (finally) went public, with discussion forum created.
  
 
=== WTP Calendar  ===
 
=== WTP Calendar  ===
Line 133: Line 135:
 
Smoke tests and declared M builds will resume in ... ?
 
Smoke tests and declared M builds will resume in ... ?
 
: See [http://dev.eclipse.org/mhonarc/lists/wtp-dev/msg07850.html Carl's proposal].  
 
: See [http://dev.eclipse.org/mhonarc/lists/wtp-dev/msg07850.html Carl's proposal].  
: Nitin proposed 10/29 to start.
+
: [http://dev.eclipse.org/mhonarc/lists/wtp-dev/msg07853.html Nitin proposed] starting on 10/29.  
  
 +
Oct 29: WTP 3.2.3 M build
 +
Nov 5:  WTP 3.2.3 M build
 +
Nov 5:  WTP 3.3.0 S build (M3)
 +
Nov 19: WTP 3.2.3 M build
 +
Dec 3: WTP 3.2.3 M build
 +
Dec 9: WTP 3.3.0 S build (M4)
 +
Dec 17: WTP 3.2.3 M build
 +
 +
1/7  WTP 3.2.3 M build
 +
1/14 WTP 3.2.3 M build (Helios SR2 RC1) (start PMC +1)
 +
1/21 WTP 3.2.3 M build
 +
1/28 WTP 3.2.3 M build (Helios SR2 RC2) (start PMC +2)
 +
 +
2/4  WTP 3.2.3 M build (Helios SR2 RC3) (start PMC +3)
 +
2/4  WTP 3.3.0 S build (M5)
 +
2/11 WTP 3.2.3 M build (Helios SR2 RC4)
 +
 +
3/11 WTP 3.3.0 S build (M6)
  
 
<!--
 
<!--
Line 195: Line 215:
 
* Project Leads: See subproject plan documents under <code>standard-project-plans\indigo\</code>
 
* Project Leads: See subproject plan documents under <code>standard-project-plans\indigo\</code>
  
** Planning document tip: be sure to use '&amp;' in place of '&' in URL queries
+
:* Tip while writing Planning document: be sure to use '&amp;amp;' in place of merely '&' in URL queries
  
 
* Initial Planning document by M2
 
* Initial Planning document by M2
Line 242: Line 262:
  
 
9/24 WTP M2
 
9/24 WTP M2
 +
 +
11/4 WTP M3
  
 
== Other business  ==
 
== Other business  ==
Line 251: Line 273:
 
* Final? status of archived repo: I did separate code and tests repositories, zipped repos now distinct.  
 
* Final? status of archived repo: I did separate code and tests repositories, zipped repos now distinct.  
  
" p2 infused builds, taking info account "history" of previous builds is nearing completion. See [[/WTP/Build/Accounting_for_history_during_builds]].
+
* p2 infused builds, taking info account "history" of previous builds is nearing completion. See [[WTP/Build/Accounting_for_history_during_builds]].
 +
 
 +
* committer-to-committer question on [http://dev.eclipse.org/mhonarc/lists/wtp-wst-dev/msg00389.html XML Schema Content Model API]?
  
 
== References  ==
 
== References  ==

Latest revision as of 13:56, 14 October 2010

WTP Development Status Meeting

Attendees

Project Leads
Carl
Tim
Keith
Nitin
Chuck
Kaloyan
Raghu
Neil
David
Committers
Bob
Konstantin
Chris
Dave
Larry
Kate
Angel
Valentin
Paul
Nick
Gabriel
Eric
Rob
Sam
Friends
Elson
Ian
Aidyl

Note: feel free to correct any errors/omissions in above attendance record.

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

  • Cool stuff coming up:
ESE 2010
RTP DemoCamp

WTP Calendar

(Weekly Google Calendar updated through June, 2010)


For Indigo/Helios overall dates, see a Simultaneous Release Calendar



WTP 3.2.3

3.2.3 builds are running on R3_2_maintenance maps (and R2_3_maintenance for Dali)

Still needs work on releng tests and exact distribution zips

Smoke tests and declared M builds will resume in ... ?

See Carl's proposal.
Nitin proposed starting on 10/29.
Oct 29: WTP 3.2.3 M build 
Nov 5:  WTP 3.2.3 M build
Nov 5:  WTP 3.3.0 S build (M3)
Nov 19: WTP 3.2.3 M build
Dec 3: WTP 3.2.3 M build
Dec 9: WTP 3.3.0 S build (M4)
Dec 17: WTP 3.2.3 M build

1/7  WTP 3.2.3 M build
1/14 WTP 3.2.3 M build (Helios SR2 RC1) (start PMC +1)
1/21 WTP 3.2.3 M build
1/28 WTP 3.2.3 M build (Helios SR2 RC2) (start PMC +2) 

2/4  WTP 3.2.3 M build (Helios SR2 RC3) (start PMC +3) 
2/4  WTP 3.3.0 S build (M5)
2/11 WTP 3.2.3 M build (Helios SR2 RC4)

3/11 WTP 3.3.0 S build (M6)


WTP 3.3.0


Planning

  • Project Leads: See subproject plan documents under standard-project-plans\indigo\
  • Tip while writing Planning document: be sure to use '&amp;' in place of merely '&' in URL queries
  • Initial Planning document by M2
  • Iterate/Review plans by M3
  • Final Plans by M4


Themes

  • improve Java EE 6 support
  • e4 (Eclipse 4.1) tolerance (no exploitation of non compatible function planned)
  • Objective is to work with both Platform 3.7 and 4.1 (with only one set of compiled code ... compiled against 3.7)
See briefest Eclipse 4.0 intro. One thing I forgot there, was a pointer to e4-dev mailing list ... that's were Eclipse 4.0 builds are currently discussed, announced (in addition to e4-only topics).


Other Candidate Themes?

Anyone interested in these? Resources available? Do they cross projects, or just enhancement to one or two?

  • Maven enablement support (at least make more friendly for maven users, if not direct support)
  • OSGi enterprise support
  • Any items from "top 10" list of problems to focus on. deadlocks? performance? modularity? api? test coverage?
  • ... ?

Schedule

8/13 WTP M1

9/24 WTP M2

11/4 WTP M3

Other business

  • Do we need a feature patch in webtools/helios/repository for bug 321602. Is it a blocker? (in effect) Is it a regression? (since which release?)
Is a regression since Galileo ... just not noticed in Helios initial release. Starts to effect performance with as few as 3 or so projects. Will investigate.
[No action yet]
  • Final? status of archived repo: I did separate code and tests repositories, zipped repos now distinct.

References


Also, see

WTP 3.2.x maintenance release plan

how/when to branch code?

WTP_3.2_Ramp_down_Plan_for_Helios

IP Logs selector

WTP Helios retrospective.


See also the WTP Meeting Archive-Reference Page.

Back to the top