Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2007-12-20"

(WTP 3.0 M4)
 
(13 intermediate revisions by 4 users not shown)
Line 2: Line 2:
  
 
=== Attendees ===
 
=== Attendees ===
 +
Raghu, Dave, Nitin, Kathy, Rob, David, Amy, Valentin, Kate, Tim, Helen, Carl, Neil, Chuck, Bob
  
 
=== Announcements And Reports ===
 
=== Announcements And Reports ===
 +
No meeting next week.  Next meeting Jan 3rd 2008.  Happy Holidays! :)
  
 +
==== New Frameworks ====
 +
 +
Please see/review [http://dev.eclipse.org/mhonarc/lists/wtp-dev/msg05786.html new validation framework] in builds this week.
 +
 +
New [http://dev.eclipse.org/mhonarc/lists/wtp-dev/msg05783.html Session Bean Wizard].
 +
 +
Kaloyan:What's the process to request for images and icons from new session bean wizard, what's the process to request for actions for the menus?
 +
David/Carl:Open a bugzilla with screen shot with context on what's  required.  Open to JST.J2EE, will take it from there.
  
 
====Focus on Backlog and Quality metrics (Neil) ====
 
====Focus on Backlog and Quality metrics (Neil) ====
Line 10: Line 20:
  
 
:*Current Focus Item:
 
:*Current Focus Item:
::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=nowords&keywords=helpwanted&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=regexp&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2007-01-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=noop&value0-0-0=%7C%2C Untargeted Enhancements opened before January 1st, 2007] (Last week - 105; Currently ~ 105)
+
::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=nowords&keywords=helpwanted&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=regexp&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2007-01-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=noop&value0-0-0=%7C%2C Untargeted Enhancements opened before January 1st, 2007] (Last week - 105; Currently ~ 99)
 
::*Options are
 
::*Options are
 
:::*Invalid - Enhancement does not fit with the scope of the project or is already implemented.
 
:::*Invalid - Enhancement does not fit with the scope of the project or is already implemented.
Line 25: Line 35:
 
::::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0&target_milestone=3.0+M1&target_milestone=3.0+M2&target_milestone=3.0+M3&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=nowords&keywords=helpwanted&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&emailtype1=regexp&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2007-01-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=noop&value0-0-0=%7C%2C All 3.0 targeted severity "Major" and higher bugs opened before January 1st, 2007] (~69)
 
::::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0&target_milestone=3.0+M1&target_milestone=3.0+M2&target_milestone=3.0+M3&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=nowords&keywords=helpwanted&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&emailtype1=regexp&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2007-01-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=noop&value0-0-0=%7C%2C All 3.0 targeted severity "Major" and higher bugs opened before January 1st, 2007] (~69)
  
====Focus on Requirements Planning (Raghu)====
 
:*Review and Update the [[Web Tools Platform Release 3.0 Requirements | WTP 3.0 Plan]] by '''12/06'''
 
::Projects with no committed items: '''JPA'''
 
::Please update [[WTP_Requirements_Main#Documentation | '''status page''']]
 
 
:*Please review untriaged enhancement requests
 
::[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailassigned_to1=1&emailtype1=substring&email1=inbox&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=|  Untriaged Enhancement Requests] (19)
 
  
:*[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=plan&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=| Plan items in Bugzilla] (41)
 
  
 
=== WTP 2.0.2 ===
 
=== WTP 2.0.2 ===
Line 91: Line 93:
 
=== Other business? ===
 
=== Other business? ===
  
:* ?
+
:* Project leads, please complete [http://www.eclipse.org/webtools/development/news/3.0M4/ M4 New and Noteworthy] as soon as possible.
 +
David: New and Noteworthy added for M4, pls update your section before leaving for holidays or up on returning before Jan 7th
 +
I builds will become S builds starting next week
 +
All triaged bugs in inbox
  
 
== Teams Status and Focus for Coming Week ==
 
== Teams Status and Focus for Coming Week ==
Line 98: Line 103:
  
 
==== Source Editors ====
 
==== Source Editors ====
*JSP source parser updates for ''complete our JSP 2.0 support'' requirement [https://bugs.eclipse.org/bugs/show_bug.cgi?id=150794 150794]
+
*Shutting down M4
*Addressing 3.0 requirement for ''more configurable XML and HTML formatting'' ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=95091 95091],[https://bugs.eclipse.org/bugs/show_bug.cgi?id=194698 194698])
+
*Continuing JSDT integration
+
*Working on updating bug backlogs
+
 
*Ongoing triaging of incoming bug reports
 
*Ongoing triaging of incoming bug reports
  

Latest revision as of 16:41, 20 December 2007

WTP Development Status Meeting 2007-12-20

Attendees

Raghu, Dave, Nitin, Kathy, Rob, David, Amy, Valentin, Kate, Tim, Helen, Carl, Neil, Chuck, Bob

Announcements And Reports

No meeting next week. Next meeting Jan 3rd 2008. Happy Holidays! :)

New Frameworks

Please see/review new validation framework in builds this week.

New Session Bean Wizard.

Kaloyan:What's the process to request for images and icons from new session bean wizard, what's the process to request for actions for the menus? David/Carl:Open a bugzilla with screen shot with context on what's required. Open to JST.J2EE, will take it from there.

Focus on Backlog and Quality metrics (Neil)

Neil: Untargeted Enhancement is still the focus

  • Current Focus Item:
  • Invalid - Enhancement does not fit with the scope of the project or is already implemented.
  • helpwanted keyword - This is a valid request, but due to committer resources and other priorities, outside help will be needed to make this happen.
  • Future - I would use this in conjunction with the helpwanted keyword. I use this for legitimate requests that are important but will not make any planned release, but likely will make a future release.
  • Upcoming Focus Item:
  • Past Focus Items:
Where did they all go?


WTP 2.0.2


  • Bug Lists
All Remaining 2.0.2 Targeted Bugs (~42)
2.0.2 Hot Bug Requests (~0)
2.0.2 Hot Bugs (~0)
2.0.2 Bugs for PMC Approval (~0)
2.0.2 Untargeted Blockers/Criticals (~0)
2.0.2 Blockers/Criticals (~0)
2.0.2 Total JST, WST, JSF Bugs Fixed (~68)
2.0.2 Dali Total Bugs Fixed (~4)
2.0.2 Resolved, Unverified Blockers/Criticals (~20) By Assignee

WTP 3.0 M4

  • M4 Schedule
  • our +2 date: Monday, January 7 2008
  • Final Code released by December 21
Plan 11/19 - 11/23
Development 11/26 - 12/21
Test 12/24 - 01/04 (excluding holidays)


1 Junit failures in JSP but should not affect other components
  • Bug Lists
3.0 Invalid Targeted Bugs (~9)
3.0 M4 Targeted Bugzilla Enhancements (~12)
All Remaining 3.0 Targeted Enhancements (~185)
3.0 M4 Remaining Targeted Bugs (~36)
3.0 M4 Hot Bug Requests (~0)
3.0 M4 Hot Bugs (~0)
3.0 M4 Blockers/Criticals (~0)
3.0 M4 JST, WST, JSF Bugs Fixed (~75)
3.0 M4 JPT Dali Bugs Fixed (~2)
3.0 Untargeted Blockers/Criticals (~0)
3.0 Resolved, Unverified Blockers/Criticals (~30) By Assignee

Other business?

David: New and Noteworthy added for M4, pls update your section before leaving for holidays or up on returning before Jan 7th I builds will become S builds starting next week All triaged bugs in inbox

Teams Status and Focus for Coming Week

Server Tools

Source Editors

  • Shutting down M4
  • Ongoing triaging of incoming bug reports

Web Services/WSDL

  1. Ongoing triage of incoming and existing bugs/RFEs.
  2. Work on RFEs and bugs targetted to M4.

Java EE

Dali JPT

JSF

  • Planning for M3
  • Property Editor prototype
  • JSPX support investigation
  • XHTML support investigation


References

  • Branching Strategy
In general, the minimum is if you branch a plug-in to branch all the plug-ins in the corresponding map file. It is fine to branch everything if you choose as well. We may need to reorganize map files slightly and we can investigate that on a case by case basis. This is intended to be a living document and open to evolutions and improvements.
  • Instructions for tagging existing and new WTP wiki pages can be found at WTP's Category page; remember, we can create subcategories as well
  • This Week's Smoke Test Results
WTP Smoke Test Results R30
Information about process for milestone bugzilla line item planning has been added to the WTP Bugs, Workflow, and Conventions document.
PMC Candidate Review Request Checklist - See the updated PMC Review document with attention to the "How To Prepare a PMC Defect Candidate" section
Adopter Migration Information for WTP 2.0 - Please add any details for your component.
  • Website
Documentation on Setting up your system for Web Tools Web site development and Using Web Tools Phoenix PHP templates is on the wiki at Web Tools Web Site Development.
The next Bug Day is December 28th, participation is voluntary.
Mark any applicable bugs with keyword "bugday", but only if you'll have a representative on hand to respond through Bugzilla or in IRC
Current WTP Bug Day bugs (~53)


Bug Backlogs

All Untriaged WTP Bugs (Graph)
All Untriaged WTP Bugs (~166)
All WTP Verified, Not Closed Bugs (Graph)
All WTP Verified, Not Closed Bugs (~120)
All WTP Resolved, Unverified Bugs (Graph)
All WTP Resolved, Unverified Bugs (~1299)
All WTP Defect Backlog (Graph)
All WTP Defect Backlog (~3168)
All WTP Future Bugs (~89)
All Open WTP Bugs with Patches Attached (Graph)
All Open WTP Bugs with Patches Attached (~219)
All API Requests (~11)


Back to WTP Meeting Archives

Back to the top