Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Virgo/Community/Minutes-2012-06-25"
(→Attendees) |
|||
Line 2: | Line 2: | ||
__NOTOC__ | __NOTOC__ | ||
== Attendees == | == Attendees == | ||
− | |||
* Borislav Kapukaranov - SAP | * Borislav Kapukaranov - SAP | ||
* Chris Frost - VMware | * Chris Frost - VMware |
Revision as of 09:42, 25 June 2012
Attendees
- Borislav Kapukaranov - SAP
- Chris Frost - VMware
- Glyn Normington - VMware
Apologies
- Violeta Georgieva - SAP
Discussion
- Glyn has updated the plan versions to 3.5.0 and is working on bundlor documentation and investigating Spring integration and, in relation to bug 378006, the kernel file system code.
- Chris is working on the new admin console in preparation to merge into master post 3.5.0.
- Borislav has deferred the shared iyy cache to post 3.5.0 since it involves a change to the test framework, so he is working on updating Equinox and similar dependencies in preparation for 3.5.0. He will create 3.5.0.RC1 and create a 3.5.x branch this week. Chris will advise on how best to do drive releaselor to achieve this. Master will be re-versioned to 3.6.0.
- Chris asked Borislav to review the email to virgo-dev about restructuring the Virgo git repositories.