Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "UIBPWG070919"
(→Mylyn UI Review) |
|||
Line 4: | Line 4: | ||
Discussion of what the deliverables can be for the Ganymede train. We are not in a place to commit to having the entire guidelines updated. Current proposal is to focus on the top 10 UI guidelines and make compliance a requirement / suggestion. Need to get consensus on the top 10 list at the next meeting. | Discussion of what the deliverables can be for the Ganymede train. We are not in a place to commit to having the entire guidelines updated. Current proposal is to focus on the top 10 UI guidelines and make compliance a requirement / suggestion. Need to get consensus on the top 10 list at the next meeting. | ||
=== Mylyn UI Review === | === Mylyn UI Review === | ||
− | Held a Mylyn UI Review. Start at the [http://www.ibm.com/developerworks/java/library/j-mylyn1/ Mylyn tutorial]. There was a lot of discussion of the elements in [http://www.ibm.com/developerworks/java/library/j-mylyn1/sidefile.html figure 1]. Some of the design decisions the Mylyn team made were, keeping the list flat so it could be scanned easily, and a dedicated column for indicating incoming and outgoing information. | + | Held a Mylyn UI Review. Start at the [http://www.ibm.com/developerworks/java/library/j-mylyn1/ Mylyn tutorial]. There was a lot of discussion of the elements in [http://www.ibm.com/developerworks/java/library/j-mylyn1/sidefile.html figure 1]. Some of the design decisions the Mylyn team made were, keeping the list flat so it could be scanned easily, and a dedicated column for indicating incoming and outgoing information. Switching multiple types of working sets at the same time remains a challenging issue. |
+ | |||
=== Next call === | === Next call === | ||
The next meeting will be at 10:00 PDT / 17:00 UTC on October 3rd. | The next meeting will be at 10:00 PDT / 17:00 UTC on October 3rd. |
Latest revision as of 14:02, 19 September 2007
Attending
Mik Kersten, Boris Bokowski, Kimberley Peter, Neil Hauge, Tod Creasey, Bob Fraser
Plan for Ganymede
Discussion of what the deliverables can be for the Ganymede train. We are not in a place to commit to having the entire guidelines updated. Current proposal is to focus on the top 10 UI guidelines and make compliance a requirement / suggestion. Need to get consensus on the top 10 list at the next meeting.
Mylyn UI Review
Held a Mylyn UI Review. Start at the Mylyn tutorial. There was a lot of discussion of the elements in figure 1. Some of the design decisions the Mylyn team made were, keeping the list flat so it could be scanned easily, and a dedicated column for indicating incoming and outgoing information. Switching multiple types of working sets at the same time remains a challenging issue.
Next call
The next meeting will be at 10:00 PDT / 17:00 UTC on October 3rd.