Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Trace Compass/Project Meetings/2016-03-18"

Line 7: Line 7:
 
* Meeting was scheduled and done
 
* Meeting was scheduled and done
 
* Following the discussions and feedback, a new [[Trace_Compass/Design_Documents/Project_View | proposal]] was added to the Design Documents.
 
* Following the discussions and feedback, a new [[Trace_Compass/Design_Documents/Project_View | proposal]] was added to the Design Documents.
 +
 +
=== Summary of EclipseCon ===
  
 
=== API Cleanup for Neon ===
 
=== API Cleanup for Neon ===

Revision as of 18:37, 15 March 2016

Agenda

Go over the AIs of the previous meeting

Summary of the meeting about Project View modifications

  • Meeting was scheduled and done
  • Following the discussions and feedback, a new proposal was added to the Design Documents.

Summary of EclipseCon

API Cleanup for Neon

Back to the top