Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Testing Process Part 1 Draft 2 Comments

Revision as of 10:19, 3 December 2007 by Jgwest.gmail.com (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Paul Slauenwhite

  • Can we change the organization to (note new sections):
    • 1.0 Preparation
      • 1.1 Install the TPTP Test Tools
      • 1.2 Extracting the Test Resources
      • 1.3 Structure of the Test Resources
    • 2.0 Creating Tests
      • 2.1 Manual Test Suites
      • 2.2 JUnit and JUnit Plug-in Test Suites
      • 2.3 AGR Test Suites
    • 3.0 Executing Tests
      • 3.1 Manual Test Suites
      • 3.2 JUnit and JUnit Plug-in Test Suites
      • 3.3 AGR Test Suites
    • 4.0 Common Tasks
      • 4.1 Creating Test Suites
      • 4.2 Launching Test Suites
      • 4.3 Viewing Test Logs
      • 4.4 Report Test Results
    • 5.0 Help
  • We need to document the BVT process:
    • The root-level test suites for BVTs.
    • The test infrastructure will execute the org.eclipse.hyades.tests/AllBVT<test type>Tests.testsuite test suites.
    • We do not need to check-in the execution results to CVS due to disk space limitations and polluting of our test pass results.
    • Each developer can rerun the automated tests to reproduce a failure.
  • We need to add the new structure in CVS, which now to three sets of root level test suites in the TP1, TP2, BVT directories.
  • 1.1:
    • "1. Open the TPTP download site (embedded link to http://www.eclipse.org/tptp/home/downloads/)."
    • "2. Select the release of TPTP to be tested and download...". Capitalize Remember in the note. AGR is now an as-is component (not Technology Preview).
  • 1.2:
    • i) "for that subproject".
    • 2) "beginning of each test pass, test report generation, etc.".
  • 1.3:
  • 1.4:
  • 1.5:
  • 1.6:
    • In step 1, change _results to results and give an example of the structure.
    • In step 2, change id to identifier.
  • 2.0:
    • Move to new 4.1 section.
    • In steps 2 and 7, move new section 1.3.
    • In step 6, move section from part 2 to here.
  • 2.1, 2.2 and 2.3 should contain instructions for creating the specific type of tests.
  • 2.3:
    • Move 1 a, c, d to new 1.3 section.
    • In step b, append ", if applicable".
  • 2.4:
    • Need more content here about what is expected from developers for BVT (e.g. all tests in the root level BVT test suites are ran every build and it is expected that developers will test locally before checking into CVS).
  • 3.0 and 4.0:
  • New 4.2 section:

Note: The name and directory structure containing the generated execution history file MUST be the same as it will be in CVS in order for generated reports to work correctly.

Back to the top